José Emilio Tabora

José Emilio Tabora

About

Detail

Tegucigalpa, Francisco Morazán Department, Honduras

Contact José regarding: 
work
Full-time jobs
Starting at USD1.4k/month
id_card
Internships
groups
Networking

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • S
    Electrical & Field Operations Engineer
    SERELE
    Jan 2026 - Current (7 months)
    • Led the design and pre-construction planning of a 60 kW rooftop photovoltaic system, including system layout, technical specifications, and execution readiness. • Supervised and coordinated a field crew of 5 electrical technicians, assigning tasks, tracking progress, and ensuring timely completion of electrical work. • Managed day-to-day field operations, troubleshooting electrical issues and ensuring rapid resolution, including work on medium-voltage systems. • Provided technical training to installation crews on photovoltaic systems, improving field performance and project execution readiness. • Acted as Project Manager for Mediplaza (operating rooms project), coordinating material procurement, logistics, schedules, and workforce alloca
  • P
    Renewable Projects Consultant, Deputy Plant Manager
    PEDRACLAU(GESSA GENERA)
    Sep 2024 - Dec 2025 (1 year 4 months)
    • Supported the technical operation and maintenance of Central Hidroeléctrica Río Betulia (5.5 MW Pelton & 1.5 MW Pelton) in Santa Fé, Colón, and Central Hidroeléctrica Los Laureles (2 × Francis turbines) in San Juan Pueblo, Atlántida, ensuring reliable and efficient generation. • Coordinated major overhauls, including the Francis turbine runner replacement (2024) and the dismantling and reassembly of a 5.5 MW Pelton unit after a shaft fracture (2024–2025), managing logistics, tools, schedules, and external contractors from Costa Rica. • Drafted detailed technical and financial reports for insurers and banks, evaluating failure scenarios, repair costs, and schedules to secure claim approvals and disbursements. • Participated in the design a
  • E
    Maintenance
    Empresa Propietaria de la Red (EPR)
    Jan 2024 - Apr 2024 (4 months)
    • Elaborated detailed reports on equipment maintenance at the San Buenaventura substation and on the towers of the SIEPAC line. • Participated in maintenance maneuvers for the neck (hot spot) and bridge change of the disconnectors at the El Cajón line. • Resolved faults in the SEL 421 relays at the El Cajón line related to proper line voltage reading. • Streamlined data collection and created an Excel database for better control and analysis of information. • Participated in meetings and contributed valuable ideas for improving monitoring with SCADA system for better oversight of the San Buenaventura substation. • Planned and executed maintenance programs in compliance with ISO 45,001 safety protocols.
Education verified_user 0% verified
  • Huawei
    Seeds For the Future Honduras Representative
    Huawei
    Aug 2024
  • U
    Bachelor of Energy Engineering
    Universidad Tecnológica Centroamericana (UNITEC)
    Jun 2024
  • University at Buffalo
    Solar Energy and Electrical System Design
    University at Buffalo
    Dec 2023
  • Technical University of Denmark
    Wind Energy
    Technical University of Denmark
    Dec 2022
  • University at Buffalo
    Electric Power Systems
    University at Buffalo
    Sep 2022
  • Macris School
    High School Diploma in Science and Humanities
    Macris School
    Jun 2019
Projects (professional or personal) verified_user 0% verified
  • UNITEC
    Energy-Efficient Building Retrofit Analysis
    UNITEC
    Apr 2023 - Jun 2023 (3 months)
    • Conducted detailed on-site surveys to generate precise "As-Built" Revit models for a 3-story, 560 m^2 university facility, serving as the foundational baseline for renovation estimates. • Leveraged BIM data to produce accurate Quantity Takeoffs (QTO) and define the scope of work for photovoltaic, hydraulic, and metering upgrades. • Exported schedules to Excel to organize Bills of Materials (BOM), facilitating precise cost estimation and material procurement planning. • Evaluated the feasibility of MEP integrations within the existing 3-level structure, calculating the projected ROI based on installation costs vs. long-term energy savings.
  • B
    Energy Audit & Cost Optimization
    Bon Bakery
    Jan 2023 - Mar 2023 (3 months)
    • Performed a technical energy audit aligned with ISO 50,003 standards, evaluating facility infrastructure and equipment to identify cost-saving opportunities. • Analyzed operational data to calculate energy load profiles, providing a detailed baseline for budgetary adjustments and utility cost forecasting. • Developed a cost-benefit analysis for the installation of a photovoltaic system, estimating potential reductions in overhead expenses and project payback periods. • Identified high-impact efficiency upgrades, translating technical findings into actionable recommendations for facility improvements and capital expenditure planning.