Jorge Alberto Pardo Torres

Jorge Alberto Pardo Torres

About

Detail

Gerente de Ingeniería
Mexico

Contact Jorge regarding: 
Finding co-founders
groups
Networking

Timeline


work
Job
school
Education
auto_stories
Publication

Résumé


Jobs verified_user 0% verified
  • O
    Engineering Director
    OCCEPPA SC
    Oct 2021 - Jun 2024 (2 years 9 months)
    • I served as Engineering Director , responsible for developing and implementing, using Industrial Engineering techniques, the analyses required for the development and analysis of human factors – machinery and raw materials, leading to the development of product manufacturing. Proposing, supervising and executing Lean and Continuous Improvement Projects. • Responsible for ensuring that all plant and company projects, processes and/or procedures are met. • Responsible for the implementation of Lean Manufacturing : 5S's, Problem analysis and solution, Standard work, Value Stream Mapping , SMED, Idea Management, Hoshin kanri , TPM Principles. • Responsible for planning and scheduling projects and supporting technical and economic proposal
  • O
    Gerente de Proyectos de Ingeniería y Mejora Continúa
    OCCEPPA SC
    Oct 2021 - May 2023 (1 year 8 months)
    Responsabilidades: • Me desempeñé como Gerente de Ingeniería y Mejora Continúa siendo responsable de desarrollar e implementar mediante técnicas de la Ingeniería Industrial los análisis requeridos para la elaboración y análisis de los factores humanos – maquinaría y materia prima, conlleven al desarrollo de la manufactura del producto. Proponer, Supervisar y Ejecutar Proyectos de Mejora Continua y Lean. • Responsable de todos los proyectos, procesos y/o procedimientos de la planta y la compañía se cumplan. • Responsable de la implementación de Lean Manufacturing: 5S´s, Análisis y solución de problemas, Trabajo estándar, Value Stream Mapping, SMED, Gestión de ideas, Hoshin kanri, Principios de TPM. Móvil 9931321990 • Responsable de la ge
  • O
    Gerente de Ingeniería y Mejora Continúa
    OCCEPPA SC
    Oct 2021 - May 2023 (1 year 8 months)
    Responsabilidades: • Me desempeñé como Gerente de Ingeniería y Mejora Continúa siendo responsable de desarrollar e implementar mediante técnicas de la Ingeniería Industrial los análisis requeridos para la elaboración y análisis de los factores humanos – maquinaría y materia prima, conlleven al desarrollo de la manufactura del producto. Proponer, Supervisar y Ejecutar Proyectos de Mejora Continua y Lean. • Responsable de todos los proyectos, procesos y/o procedimientos de la planta y la compañía se cumplan. • Responsable de la implementación de Lean Manufacturing: 5S´s, Análisis y solución de problemas, Trabajo estándar, Value Stream Mapping, SMED, Gestión de ideas, Hoshin kanri, Principios de TPM. Móvil 9931321990 • Responsable de la ge
  • O
    Director of operations
    OCCEPPA SCPARTEK Specialized Services
    Oct 2019 - Jun 2024 (4 years 9 months)
    • I served as Director of Operations , being responsible for the direction, management and execution of different simultaneous projects. • Periodic meetings with managers of technical, operations, administration and finance areas, project managers, and human resources managers to evaluate the performance of the projects and determine the missing requirements to meet the client in a timely manner. • I have collaborated in gasoline and diesel transportation companies, managing resources and logistics in the operations area. • In order to optimize human and material resources to reduce costs and maximize the company's profits. • I have implemented processes in accordance with the company's vision and objectives. • Development and evaluat
  • O
    Operations and Services Manager Technical - Financial
    OCCEPPA SC.
    Oct 2016 - Sep 2021 (5 years)
    • I served as Operations and Services Manager, designing project control strategies with KPIs and visualizing technical-financial performance on smart dashboards. • I was responsible for preparing the technical and economic proposals for the Specialized Technical projects for preparation in conjunction with PEMEX personnel and signing of the contracts. • Responsible for the development of a process for the analysis and gathering of project requirements for the planning and coordination of the resources and services necessary for the project Optimal Design of the Additional Hydrocarbon Recovery Process of the Ixtal Field . • I was responsible for the planning, monitoring and management process of work tools, telecommunications and comput
  • O
    Gerente de Operaciones y Servicios
    OCCEPPA SC.
    Oct 2016 - Sep 2021 (5 years)
    Coordinador Técnico - Financiero - Operativo del Proyecto Diseño óptimo del Proceso de Recuperación Adicional de Hidrocarburos del Campo Ixtal. Responsabilidades: • Me desempeñé como Gerente de Operaciones y Servicios, se diseñó de estrategias de control de proyectos con KPIs y visualizar los desempeños técnicos – financieros en tableros inteligentes. • Fui responsable de la elaboración de las propuestas técnicas económica de los proyectos Técnicos Especializado para la elaboración en conjunto con personal de PEMEX y firma de los contratos. • Responsable del desarrollo de un proceso para el análisis y levantamiento de requerimientos de los proyectos para la planeación y coordinación de los recursos y servicios necesarios para el proyecto
  • O
    Operations and Services Manager
    OCCEPPA SC
    Oct 2016 - Sep 2019 (3 years)
    Achievements: • The process based on an information system was implemented for the analysis and gathering of project requirements for the planning and coordination of the resources and services necessary for the projects. The system allowed project planning to be increased and streamlined by 40%. • The process of planning, monitoring and managing work tools, telecommunications equipment, infrastructure and computing was implemented in coordination with the systems and infrastructure areas, reducing time by 60%. • was implemented in coordination with the systems area, reducing time by 50% • -I prepared and accepted the technical-economic proposal for the project development of the technical reliability project in the laboratories of the
  • O
    Technical operational manager
    OCCEPPA SC.
    Aug 2016 - Dec 2018 (2 years 5 months)
    • The technical - economic proposals were prepared, presented and accepted as coordinator of the technical - operational activities of Contract No. IA-03890Y999- E14-2016 related to the "Technological Intelligence Service and technological analysis to be used in technology evaluations for PEMEX ". For the search and analysis of new technologies, the IDEAS methodology was used in the search for technology such as: Submersible electrocentrifugal pumping for heavy and extra heavy oil with H 2 S and CO 2 , New hydrocarbon dehydrators, Multiphase hydraulic simulator , Turbine Systems With Rimadora Shoe, Technology for real-time monitoring of drilling fluid properties and congenital water treatments. Additionally, technological information from
  • O
    Operation and Services Manager
    OCCEPPA SC.
    Aug 2016 - Sep 2021 (5 years 2 months)
    Responsibilities: • I served as Operations and Services Manager, • Project control strategies were designed with KPIs and visualize technical-financial performances on smart dashboards. • I was responsible for the preparation of the economic technical proposals of the Specialized Technical projects for the preparation together with PEMEX personnel and signing of the contracts. • I was responsible for monitoring technical-operational projects. • Responsible for the development of a process for the analysis and gathering of project requirements for the planning and coordination of the resources and services necessary for the project Optimal Design of the Additional Hydrocarbon Recovery Process of the Ixtal Field . • I was responsible fo
  • T
    Operations and Services Manager
    TORRES ROMO SA DE CV.
    Jan 2015 - Jul 2016 (1 year 7 months)
    • I served as Operations and Services Manager, projecting the acquisition of new contracts in business lines such as technology analysis, field development, information modeling, secondary and improved hydrocarbon recovery process, and evaluation of oil blocks. that was tendered by the CNH through Quick Look of the FEL methodology or using its own EDS methodology of its own registration 03-2014- 041310380900-01. Technical Support in national and international tenders for PEMEX and national private oil services operators. • I was responsible for the preparation and negotiation of technical-economic project proposals and the process of planning, controlling, coordinating and managing the resources for the operation from the initiation docum
  • T
    Gerente de Operaciones y Servicios
    TORRES ROMO SA DE CV.
    Jan 2015 - Sep 2016 (1 year 9 months)
    Responsabilidad • Me desempeñé como Gerente de Operaciones y Servicios, proyectando la captación de nuevos contratos en líneas de negocios como es el de Análisis de la tecnología, desarrollo de campos, modelado de información, proceso de recuperación secundaria y mejorada de hidrocarburos, y evaluación de bloques petroleros que licitó la CNH mediante Quick Look de la metodología FEL o empleado la metodología EDS propia de registro propio 03-2014-041310380900- 01. Soporte Técnico en licitaciones nacionales e internacionales para PEMEX y a operadoras privadas nacionales de servicios petroleros. • Fui Responsable de la elaboración y negociación de las propuestas técnicas económicas de proyectos y del proceso de planificar, controlar, coordin
  • T
    Operations and Services Manager Responsibility
    TORRES ROMO SA DE CV.
    Jan 2015 - Sep 2016 (1 year 9 months)
    • I served as Operations and Services Manager, projecting the acquisition of new contracts in business lines such as technology analysis , field development, information modeling, secondary and improved hydrocarbon recovery process, and evaluation of oil blocks. that was tendered by the CNH through Quick Look of the FEL methodology or using its own EDS methodology of its own registration 03-2014- 041310380900-01. Technical Support in national and international tenders for PEMEX and national private oil services operators. • I was responsible for the preparation and negotiation of technical-economic project proposals and the process of planning, controlling, coordinating and managing the resources for the operation from the initiation docu
  • T
    Operations Manager Responsibility
    TORRES ROMO SA DE CV.
    Jan 2013 - Dec 2014 (2 years)
    Achievements: • I coordinated the activities of Specific Agreement 428813835 "Specialized Technical Support for the optimization of the Exploitation of Oil Fields of the Abkatún – Pol - Chuc Production Asset, providing operational technical support and specialized advice on maters of Naturally Fractured Deposits, Production, Secondary and Enhanced Recovery Processes, and Analysis of financial risks in investment projects. • Design a proposal for a foaming surfactant injection process in the Pol field • I coordinated the specialized support activities in production maintenance for the Ixtal Multidisciplinary Group Manik . • I negotiated, coordinated and technically operated 23 specialized technical service orders and provided operational
  • T
    Operations Manager
    TORRES ROMO SA DE CV.
    Jan 2013 - Dec 2014 (2 years)
    Responsibility • I served as Operations Manager and Technical Operational Manager and Head of the Risk Analysis and Reservoir Engineering Area before PEMEX in the preparation, presentation and acceptance of projects within the Specific Agreement 428813835 and coordinator of the activities of the Specific Agreement 428813835 "Support Specialized Technician for the optimization of the Exploitation of Oil Fields of the Abkatún – Pol – Chuc Production Asset. • Achievements: • I coordinated the activities of the Specific Agreement 428813835 "Specialized Technical Support for the optimization of the Exploitation of Oil Fields of the Abkatún - Pol - Chuc Production Asset, providing operational technical support and specialized advice on maters
  • T
    Gerente de Operaciones
    TORRES ROMO SA DE CV.
    Jan 2013 - Dec 2014 (2 years)
    Responsabilidad • Me desempeñé como Gerente de Operaciones y Responsable Técnico Operativo y Responsable del Área de Análisis de Riesgo e Ingeniería de Yacimiento ante PEMEX en la elaboración, presentación y aceptación de los proyectos dentro del Convenio Específico 428813835 y coordinador de las actividades del Convenio Específico 428813835 "Soporte Técnico Especializado para la optimización de la Explotación de Campos Petroleros del Activo de Producción Abkatún – Pol - Chuc. Logros: • Coordiné las actividades del Convenio Específico 428813835 "Soporte Técnico Especializado para la optimización de la Explotación de Campos Petroleros del Activo de Producción Abkatún – Pol - Chuc, dando soporte técnico operativo y asesoría especializada
  • O
    and Services Manager/Project Manager
    OCCEPPA GROUP
    Aug 2012 - Current (13 years 2 months)
    • I served as General Director to direct a consortium of companies that generate synergies to carry out projects that make business processes more efficient and increase the value of companies that require our comprehensive services. • Direct, plan, coordinate, manage a company dedicated to general and specialized supply for the development of engineering, technology and consulting to provide our clients with added value to maximize profits. • Direct , plan, coordinate, manage and optimize all the company's resources, from the purchase of raw materials to their final use. • Prepare the group's 5-year strategic plan. • Responsible for the implementation and certification of the ISO 9000:2015 quality system • Responsible for the Digital
  • S
    Senior Technical Consultant , Secondary and Enhanced Recovery and Evaluation Leader in
    SCHLUMBERGER DE MEXICO.
    Jan 2011 - Dec 2012 (2 years)
    Reservoir Engineering, Reliability Engineering Analysis Responsibility • I served as a Senior Technical Consultant Leader in Reservoir Engineering, Additional Hydrocarbon Recovery Processes, Process Reliability Assessment and Financial Risk Analysis in the Specialized Technical Assistance Project in Management of Opinions for Exploitation Projects. Achievements: • I created the guiding document that served as a guide for the evaluation of the different phases of the FEL VCD. • I issued a ruling on changes in the amount and scope in the areas of Reservoir Engineering, Additional Hydrocarbon Recovery Processes, Reliability Engineering and Financial Risk Assessment. • I reviewed 27 investment projects in their different phases FEL 8 Visual
  • S
    Senior Technical Consultant
    SCHLUBERGER OF MEXICO.
    Jan 2011 - Dec 2012 (2 years)
    Responsibility • I served as Senior Technical Consultant as Technical Leader of Reservoir Engineering, Production Engineering Secondary and Enhanced Recovery, Financial Risk Assessment. Project audit management, leadership of the work team and trust, management of recruitment of new personnel for the project, new contract negotiations with clients have been carried out satisfactorily. Innovation in clinical research has been carried out.
  • S
    Operations management and administration
    SCHLUMBERGER DE MEXICO.
    Jan 2011 - Dec 2012 (2 years)
    Consultor Técnico Senior, Recuperación Secundaria y Mejorada y Evaluación Líder en Ingeniería de Yacimiento, Ingeniería del Confiabilidad y Análisis del Riesgo. Responsabilidad • Me desempeñé como Consultor Técnico Senior Líder en Ingeniería de Yacimiento, Procesos de Recuperación adicional de hidrocarburos, Evaluación de la confiabilidad del proceso y Análisis del Riesgos Financieros en el Proyecto Asistencia Técnica Especializada en Gerencia de Dictámenes de Proyectos de Explotación. Logros: • Realicé el documento rector que sirvió de guía para la evaluación de las diferentes fases del FEL VCD. • Dictaminé por cambio de monto y alcances en las áreas Ingeniería de Yacimiento, Procesos de Recuperación adicional de hidrocarburos, de la
  • S
    Senior
    SCHLUMBERGER OF MEXICO.
    Jan 2011 - Dec 2012 (2 years)
    Technical Consultant , Secondary and Enhanced Recovery and Lead Evaluation in Reservoir Engineering, Reliability Engineering and Risk Analysis Responsibility • I served as Lead Senior Technical Consultant in Reservoir Engineering, Additional Hydrocarbon Recovery Processes, Process Reliability Evaluation and Financial Risk Analysis in the Specialized Technical Assistance Project in Exploitation Project Report Management.
  • S
    Senior Technical Consultant Leader
    SCHLUMBERGER DE MEXICO.
    Sep 2009 - Dec 2010 (1 year 4 months)
    Achievements: • I performed 16 field evaluations and their multivariate data analysis comparing their recovered factor against their atributable factor and designed 8 conceptual processes to determine the additional recovery factors ( conceptual designs ), that is, 128 conceptual additional hydrocarbon recovery process designs were carried out to determine the optimal or best. • A Reliability map was created and the risk was assessed. • I prepared a report on the MoQa methodology process and presented it to the managers of Cinco Presidentes Assets, Bellota - Chinchorro and the Exploitation Technology Managers and the Regional Management of Exploitation Projects and the Sub-directorate of Technical Exploitation Coordination. • Achieving
  • S
    Senior Technical Consultant, Technical
    SCHLUMBERGER OF MEXICO.
    Sep 2009 - Dec 2010 (1 year 4 months)
    Achievements: • I carried out 16 evaluations of the reservoirs and their multivariate data analysis comparing their recovered factor against their atributable factor and designed 8 conceptual processes to determine the additional recovery factors (conceptual designs), that is, 128 conceptual hydrocarbon additional recovery process designs were carried out. to determine the optimal or best. • A report on the MoQa methodology process was prepared and presented to the asset managers of Cinco Presidentes , Bellota - Chinchorro and the Exploitation Technology Managers and the Regional Exploitation Project Management, the Subdirectorate of Exploitation Technical Coordination. Project audit management, leadership of the work team and trust, mana
  • S
    Operations management
    SCHLUMBERGER DE MEXICO.
    Sep 2009 - Dec 2010 (1 year 4 months)
    Consultor Técnico Senior de Yacimiento, Ingeniería de Procesos, Recuperación Secundaria y Mejorada y Ingeniería de Confiabilidad y Análisis del Riesgo Financiero. Responsabilidad • Me desempeñe como Consultor Técnico Senior Líder en el proyecto Asistencia Técnica de la "Optimización de la Producción Integral usando técnicas metaheurísticas y análisis multivariado de datos", el objetivo del proyecto fue el de diseñar a través de la metodología MoQa que emplea técnicas de inteligencia artificial, los procesos de recuperación adicional de las arenas (yacimientos) productoras de aceites de los campos El Golpe, Guaricho, Rodador y Santuario. Logros: • Realicé 16 evaluaciones de los yacimientos y sus análisis de datos multivariado comparando
  • S
    Senior
    SCHLUBERGER OF MEXICO.
    Sep 2009 - Dec 2010 (1 year 4 months)
    Responsibility • I served as Senior Lead Technical Consultant in the Technical Assistance project of " Integrated Production Optimization using metaheuristic techniques and multivariate data analysis" , the objective of the project was to design through the MoQa methodology that uses artificial intelligence techniques , the additional recovery processes of the oil-producing sands (reservoirs) of the El Golpe, Guaricho, Rodador and Santuario fields.
  • M
    Well Drilling and Maintenance Specialist in the Exploration and Production Management
    MEXICAN PETROLEUM INSTITUTE.
    Aug 1996 - Dec 2008 (12 years 5 months)
    • I worked as a Well Drilling and Maintenance Specialist in the Exploration and Production Management
  • M
    Specialist in Strategic Analysis and Business Plans in Planning Management
    MEXICAN PETROLEUM INSTITUTE.
    Aug 1996 - Dec 2008 (12 years 5 months)
    I worked as a Specialist in Strategic Analysis and Business Plans in the Planning Management
  • M
    Senior Specialist Engineer/Project Coordinator
    MEXICAN PETROLEUM INSTITUTE.
    Aug 1996 - Dec 2008 (12 years 5 months)
    I served as Leader of Secondary and Enhanced Recovery projects, in the Marine, North and South Regions, of the Exploration and Production Management. Salesforce CRM. Zoho CRM. Data Reporting. Project audit management, leadership of the work team and trust, management of recruitment of new personnel for the project, new contract negotiations with clients have been carried out satisfactorily. Innovation in clinical research has been carried out.
  • Instituto Mexicano del Petróleo
    Ingeniero Especialista Senior/Coordinador de Proyectos
    Instituto Mexicano del Petróleo
    Aug 1996 - Dec 2008 (12 years 5 months)
    Líder de proyectos de Recuperación Secundaria y Mejorada, evaluación de yacimientos de las Regiones Marina, Sur y Norte Logros: • Líder de proyectos de Recuperación Secundaria y Mejorada, Así como el Análisis y Diagnóstico de los Yacimientos Naturalmente Facturados, Carbonatos y Arenas, en los Activos de producción de PEMEX de la Región Sur, Marina y Norte. • Participé en la Optimización de los procesos de recuperación segundaría (inyección agua) Sánchez Magallanes, Ogarrio o de Nitrógeno (Cantarell), o Inyección de CO2 del campo Artesa. • Se Participo en el mapeo de ingeniería de confiabilidad de los procesos RSyM
Education verified_user 0% verified
    Publications verified_user 0% verified
    • S
      "Design and Optimization of Secondary and Enhanced Recovery Processes Using Artificial Intelligence Techniques".
      SPE
      Jan 2020
    • S
      " Design of objective functions for Optimization of process of Additional Oil Recovery
      SPE
      Jan 2020
    • S
      " Design and Optimization of Secondary and Enhanced Recovery Processes Using Artificial Intelligence Techniques".
      SPE
      Jan 2020
    • S
      "Design of Objective Functions for Optimization of Process of Additional Oil Recovery".
      SPE
      Aug 2018
    • S
      " Design of Objective Functions for Optimization of Process of Additional Oil Recovery
      SPE
      Aug 2016
    • S
      SPE 108710 "Design of Objective Functions for Optimization of Process of Additional Oil Publicación el CMP de Monterrey
      SPE
      Jun 2006 - Dec 2007 (1 year 7 months)
      Se presenta un modelo multiobjetivo que se resuelve usando algoritmos de optimización (sistemas inmunes artificiales)