CECILIA B. CANOZA

CECILIA B. CANOZA

About

Detail

Santo Tomas, Calabarzon, Philippines

Contact CECILIA regarding: 
Flexible work
Starting at USD30.3/hour

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • M
    Senior Manager, Manufacturing Division
    Mariwasa Siam Ceramics, Inc.
    Jan 2022 - Mar 2023 (1 year 3 months)
    • Led KPI governance, operational reporting, and workflow visibility across manufacturing operations • Ensured alignment between production, warehouse, and leadership teams to maintain execution standards • Identified operational gaps and implemented process improvements to stabilize performance
  • M
    Finished Goods Warehouse Manager
    Mariwasa Siam Ceramics, Inc.
    Jan 2018 - Jan 2022 (4 years 1 month)
    • Directed full warehouse operations including inventory control, order fulfillment, and dispatch execution • Ensured on-time and accurate shipment of customer orders, improving fulfillment reliability and reducing errors • Maintained high inventory accuracy through cycle counts, reconciliation, and system controls • Monitored picking, loading, and shipment processes to enforce operational standards and minimize misships • Identified recurring issues and implemented root cause solutions to prevent operational breakdowns • Led team performance through KPI tracking, coaching, and strict accountability enforcement • Ensured compliance with SOPs, safety standards, and operational procedures
  • M
    Warehouse Manager (CPAC Monier – Subsidiary)
    Mariwasa Siam Ceramics, Inc.
    Jan 2014 - Jan 2018 (4 years 1 month)
    • Managed warehouse operations, stock movement, and logistics coordination • Reduced discrepancies through improved inventory control and process discipline • Strengthened coordination between warehouse, production, and distribution teams
  • M
    Shift Production Manager
    Mariwasa Siam Ceramics, Inc.
    Jan 2009 - Jan 2014 (5 years 1 month)
    • Oversaw production workflows, manpower allocation, and shift KPI performance • Reduced downtime and improved output through process improvements and team supervision • Leveraged expertise in Warehouse Management Systems (WMS) to optimize Finished Goods Transfer Processing, ensuring seamless movement from Product Sorting/Classification to the Warehouse Department.
  • M
    Earlier Leadership Roles
    Mariwasa Siam Ceramics, Inc.
    Mar 1997 - Jan 2009 (11 years 11 months)
    Technical Support Manager • Production Assistant Manager • TQM Coordinator • R&D Technologist
Education verified_user 0% verified
  • Mapúa Institute of Technology
    BS Chemical Engineering
    Mapúa Institute of Technology
    Jun 1985 - Nov 1990 (5 years 6 months)
    Licensed Chemical Engineer
Projects (professional or personal) verified_user 0% verified
  • M
    Increased the Monthly Delivery Volume from 1M Square meters to 1.20M Square Meters
    Mariwasa Siam Ceramics Inc.
    Sep 2020 - Jun 2021 (10 months)
    Successfully managed projects that increased the monthly delivery dispatch to 1.20 million square meters monthly through warehouse expansion, improved stock locator systems, WMS upgrades, additional MHEs, and a forklift operator incentive program—resulting in significant productivity gains.
  • M
    Project 85
    Mariwasa Siam Ceramics, Inc.
    Sep 2005 - Sep 2006 (1 year 1 month)
    Spearheaded the Project 85 Campaign, leading cross-functional teams to drive productivity improvements and elevate Production -Glazing Line Grade A Yield from 75% to the 85% KPI target.