Carlos Zambrano

Carlos Zambrano

About

Detail

Operaciones y Manufactura
Vitoria-Gasteiz, Basque Country, Spain

Contact Carlos regarding:Ā 

work
Full-time jobs
Starting at USD120K/year
Flexible work
Starting at USD50/hour
person_search
Finding candidates
connect_without_contact
Finding mentors
Finding co-founders
groups
Networking

Timeline


work
Job
school
Education

RƩsumƩ


Jobs verified_user 0% verified
  • N
    Operations Director
    NOVARGI
    Mar 2023 - May 2024 (1 year 3 months)
    Novargi is a leading company in the design, manufacture, and construction of process equipment for the energy industry. The company offers a wide range of products, services, and solutions, including boilers, turbines, cooling towers, industrial furnaces, and more. Novargi equipment helps power plants reduce their CO2 emissions, save water, and improve energy efficiency. The company is committed to innovation and is developing new technologies to further improve the environmental impact of its products and services. Currently, we are participating in the EPC project market in the energy sector. The company is building a compressor plant and another gas treatment plant, interconnected through a 63-kilometer pipeline. This project is an exa
  • Incedo
    Senior Control Project
    Incedo
    Feb 2021 - Feb 2023 (2 years 1 month)
    As the leader of international projects at INCED, I led the design and manufacturing of auxiliary systems for the oil, gas, and chemical industries. I closely collaborated with end-users, EPC, and OEMs, ensuring project efficiency and success. My responsibilities included project planning, scheduling, budget and time management, team supervision, communication with stakeholders, and decision-making to resolve issues. I managed a team of engineers located in various countries, ensuring the achievement of objectives.
  • N
    Head of Manufacturing - Posted in Germany
    Novacor
    Nov 2017 - Oct 2020 (3 years)
    In the hardware industry for video conferencing and stage/theater management systems, I led and supervised the production process from assembly to the installation and delivery of the final product to industrial clients and government entities. Our team was highly diverse, comprised of individuals from different nationalities, cultures, and languages. I applied skills in production planning and scheduling, inventory management, continuous improvement, and problem-solving to ensure compliance with customer requirements and achieve profitability and delivery time goals. My experience includes implementing quality management systems and project development, as well as process optimization to maximize the company's profitability and productivi
  • A
    Chief Operating Officer
    ATA Tecnoconstrucciones CA
    Jun 2012 - Oct 2017 (5 years 5 months)
    I supervised and directed the production operations of ATA, including: a) Manufacture of Atmospheric and Pressure Vessels, Pipe Spools, and Metal Structures, b) Construction of Residential Buildings, c) Prefabrication of Concrete Elements, d) Manufacturing of Sandwich Panels and type MK2) for the construction market. I ensured the optimization of processes and maximization of profitability in an environment with economic challenges such as high inflation and scarcity of raw materials. My role included strategic planning and project management, negotiating and ensuring compliance with contract and budget changes. I specialized in the preparation and evaluation of progress reports, identification and documentation of change orders, and gener
  • E
    General Manager
    Empresa de Construcciones Benvenuto Barsanti S A
    Jan 2005 - May 2012 (7 years 5 months)
    As General Manager of a leading construction company with over 50 years of history, I led a team of over 3,400 employees and supervised large-scale projects in heavy civil construction, infrastructure, industrial assembly, roadways, hydropower and electrification for public and private organizations in the oil, mining, hydroelectric and government sectors. With an annual installed capacity of 6 million man-hours and a business volume of 120 million US dollars, we managed to remain among the top five companies in Venezuela for our operational capacity. In 2005, I signed contracts for over 250 million dollars and led a record workforce of 4,128 workers. My focus on continuous improvement and the implementation of policies and decisions to o
  • E
    General Director of Projects
    Empresa de Construcciones Benvenuto Barsanti S A
    Jan 2004 - Jan 2009 (5 years 1 month)
    I served as a PMO in the construction industry, with extensive experience in resource management and successful project execution. I established standards and guidelines for project management, monitored compliance with internal regulations and procedures, tracked construction cost control and cash flow management for decision-making, and collaborated with the Commercialization Management to develop new business and establish business relationships. I worked on a wide range of projects, including earthmoving, industrial plants, heavy civil works, dams, housing, quarries, urbanizations, hydro and thermal power plants, roadwork and asphalt, electrical substations, mechanical works, industrial buildings, concrete prefabricated, rock blasting
  • E
    Project Manager
    Empresa de Construcciones Benvenuto Barsanti S A
    Jan 2003 - Sep 2011 (8 years 9 months)
    As a construction industry professional, I have extensive experience in project management and construction execution. I have successfully led projects, ensuring the achievement of goals and the attainment of intended results. My ability to set guidelines, supervise the management of construction structures and comply with internal regulations and procedures has allowed me to achieve success in previous positions. Additionally, I have worked closely with the Commercialization Management to develop new business and establish commercial relationships. My ability to keep track of construction cost control and cash flow management for decision making throughout the project enables me to optimize assigned resources. I manage project risks, i
  • E
    Cost Control Manager
    Empresa de Construcciones Benvenuto Barsanti S A
    Dec 2000 - Jan 2003 (2 years 2 months)
    RI led the implementation of cost control systems for projects. I supervised the execution of budgets, schedules, and contractual deliverables to ensure the achievement of goals on time and within budget. I monitored cash flow and continuously performed risk analysis. I coordinated with the construction site and the production department to achieve proper tracking of the technical-economic plan. I provided analytical and management information to operations and management. I advised on contractual aspects and supported the management of claims. I maintained records of service providers with the required quality and safety standards.
  • E
    Contract Administrator
    Empresa de Construcciones Benvenuto Barsanti S A
    Mar 1998 - Dec 2000 (2 years 10 months)
    I was responsible for managing project documentation, including contracts and change orders. I maintained updated records of variations, claims and delays to build formal claims, including EOT claims, which were crucial to obtaining time extensions if necessary and maintaining the economic viability of the project. In addition, I managed project cost and forecast, reviewed contract estimates and protected the company against risk. My focus on efficiency and profitability allowed me to contribute to carrying out projects in a satisfactory manner and within established deadlines.
  • C
    Head of Bidding
    CABELTEL Montajes ElƩctricos y de Telecomunicaciones C A
    Mar 1995 - Dec 1997 (2 years 10 months)
    I led and supervised the preparation and tracking of budgets for telecommunications and energy projects. I worked in collaboration with teams, related departments, suppliers, and contractors to ensure the accuracy and financial viability of each project. I used my cost analysis and estimating skills to identify and mitigate financial risks and negotiated competitive prices with suppliers. I monitored the progress of the project and prepared clear reports for the management team and customers.
  • C
    External Telephone Plant and Optical Fiber Supervisor
    CABELTEL Montajes ElƩctricos y de Telecomunicaciones C A
    Jan 1994 - Feb 1995 (1 year 2 months)
    In the field of Telecommunications, specifically in External Telephone Plant and Optical Fiber; I evaluated, programmed, coordinated, and directed the execution of construction and maintenance projects in the network. I supervised compliance with security protocols and ensured the quality and efficiency levels required by customers. I successfully led a team of 35 people.
Education verified_user 0% verified
  • F
    ORGANIZACIƓN Y GESTIƓN DE ALMACENES (COML0309). Certificado de Profesionalidad Nivel 3, Gestión logĆ­stica, de materiales
    Fondo Formación Euskadi
    Oct 2021 - Apr 2022 (7 months)
    Organizar y controlar las operaciones y flujos de mercancías del almacén, de acuerdo con los procedimientos establecidos y normativa vigente, y asegurando la calidad y optimización de la red de almacenes y/o cadena logística.
  • E
    DESIGN AND MAINTENANCE OF PHOTOVOLTAIC SOLAR ENERGY INSTALLATIONS, Solar Energy
    EnglishInMotion
    Dec 2020 - Jan 2021 (2 months)
    1. INTRODUCTION 2 SOLAR RADIATION 3. THE PHOTOVOLTAIC MODULE. THE PHOTOVOLTAIC GENERATOR. THEORETICAL CONTENTS 4. INSTALLATION 5. START-UP OF A PHOTOVOLTAIC SYSTEM. EN'GENERATOR MEASURES 6. PHOTOVOLTAIC SYSTEMS CONNECTED TO THE NETWORK 7. DESIGN OF PHOTOVOLTAIC SYSTEMS CONNECTED TO THE NETWORK. INSTALLATION PROJECT 8. MAINTENANCE. SURVEILLANCE PLAN. 9. COSTS
  • C
    SEAG024PO WASTE MANAGEMENT
    CENTRO HUELIN FORMACION TECNICO SANITARIA SL
    Oct 2020 - Dec 2020 (3 months)
  • M
    MƔster Psicologƭa de la Personalidad, Estudios generales
    Masstercursos
    Jan 2019 - Dec 2020 (2 years)
  • I
    Supply Chain Management & e-logistics Master, Supply chain and logistic
    IEBS Biztech School
    Feb 2018 - Oct 2019 (1 year 9 months)
  • U
    Diplomatura Ciencia y Gerencia Gastronómica, Gestión de restaurantes y servicios de hostelería
    Universidad Simón Bolívar
    Jan 2016 - Dec 2017 (2 years)
  • Fondonorma
    Programa modular Formación de Auditores Internos en Sistemas de Gestión de la Calidad, Tecnología/Técnico de control de
    Fondonorma
    Jan 2014 - Dec 2014 (1 year)
  • U
    Industrial Engineer, Industrial Engineer
    Universidad Nacional Experimental Politecnica Antonio Jose de Sucre
    Feb 1997 - Mar 2002 (5 years 2 months)
  • AndrĆ©s Bello Catholic University
    Bachelor of Business Administration, Business administration and management, general
    AndrƩs Bello Catholic University
    Oct 1995 - Jun 2001 (5 years 9 months)
  • IUT Antonio Jose de Sucre
    Higher University Technician in Computer Science Mention Systems, InformƔtica
    IUT Antonio Jose de Sucre
    Feb 1990 - Dec 1993 (3 years 11 months)