y

yamlakneh zinabu demoze

About

Detail

Thembisa, Gauteng, South Africa

Contact yamlakneh regarding: 
work
Full-time jobs
Starting at USD42/hour

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • ikeja
    Infrastructure Technical Lead
    ikeja
    Mar 2026 - Current (8 months)
    • Define, document, maintain and enforce infrastructure technical standards across wireless access/backhaul networks, power systems (solar, batteries, charge controllers, UPS), and tower and mast infrastructure
    • Final escalation point for complex, chronic, and high-impact infrastructure faults — lead root cause analysis (RCA) for major outages and recurring failures
    • Approve or reject infrastructure designs on technical and safety grounds — enforce compliance with approved standards and require rework where installations are non-compliant
    • Review and approve high-level infrastructure designs, upgrades, and expansions; provide technical input into project planning and infrastructure roadmaps
    • Lead and upskill 20+ infr
  • ikeja
    Infrastructure Technician
    ikeja
    Jan 2023 - Feb 2026 (3 years 2 months)
    • Tower climbing and working at height — PtMP and PtP installations on 30+ towers ranging from 21m to 50m
    • Cherry picker / elevated work platform — able to operate when technicians are unavailable, ensuring deployments continue without delay
    • Installation and precision alignment of PtMP and PtP wireless links
    • Router and managed switch deployment and configuration
    • Complete off-grid solar system installations using Victron Energy MPPTs, inverters, and battery banks
    • DC system wiring, cable sizing, fusing, and protection design
    • System commissioning, live monitoring, fault-finding, and energy optimization
    • Contributed to barrel AP mount redesign — lighter modular frame with integrated MikroTik switch
  • ikeja
    Wireless Field Technician
    ikeja
    Jan 2021 - Jan 2023 (2 years 1 month)
    • Installation, configuration, and maintenance of client WiFi networks and hotspot infrastructure
    • Ubiquiti equipment: LBE, NSM2, PowerBeam, EdgeSwitch
    • MikroTik equipment: hAP lite, RB2011, hAP ax lite, hAP ac, Cube, NRay, WAP60
    • Cambium Networks: Force 300, Force 120, Force 3000L, Force 250, XV2
    • TP-Link routers and range extenders
    • Troubleshooting and fault resolution on live client networks
    • Promoted to Infrastructure Technician in 2023 based on field performance
Education verified_user 0% verified
  • A
    Diploma — ICND1 V3 CCNA (Cisco Networking Devices)
    Alison (CPD)
    Jan 2024 - Current (2 years 10 months)
  • A
    Linux for Absolute Beginners
    Alison (CPD)
    Dec 2023 - Current (2 years 11 months)
  • A
    Linux Network Administrator
    Alison (CPD)
    Dec 2023 - Current (2 years 11 months)
  • A
    Diploma in Computer Networking
    Alison (CPD)
    Dec 2023 - Current (2 years 11 months)
  • A
    Computer Networking — Wired & Wireless Networks and Protocols
    Alison (CPD)
    Dec 2023 - Current (2 years 11 months)
  • A
    Basics of Network Engineering
    Alison (CPD)
    Nov 2023 - Current (3 years)
  • Udemy
    MikroTik MTCNA
    Udemy
    Jan 2023 - Jan 2024 (1 year 1 month)
Projects (professional or personal) verified_user 0% verified
  • ikeja
    Lehae Small Cells Deployment
    ikeja
    Jan 2025 - Feb 2026 (1 year 2 months)
    • Deployed 4 small cell nodes achieving full community coverage across Lehae, Gauteng
    • All nodes fully off-grid DC solar powered
    • Network operating at near-capacity across all sectors — high subscriber demand confirmed via NOC coverage maps
  • P
    PharrowTech 60GHz Field Testing
    Feb 2024 - Mar 2025 (1 year 2 months)
    • Conducted under Ikeja — commissioned by PharrowTech (Belgium) to perform South African field testing of their 60GHz radio product
    • Built a complete test network at own premises: AP infrastructure and 10 client nodes
    • Maintained full project documentation and map records (November 2024 onward)
    • Testing concluded successfully — PharrowTech has since moved to mass production
  • ikeja
    Witbank Multi-Community Deployment
    ikeja
    Jan 2024 - Dec 2024 (1 year)
    • Secured infrastructure investment from Seriti Resources through technical presentation of IkejaWave equipment
    • Deployed 40 small cell nodes across 4 communities: Phola (11), Kwa-Guqa (20), Siyanqoba (3), Clarinet (6)
    • All sites fully off-grid, designed and deployed end-to-end
  • ikeja
    IkejaWave 60GHz Radio Development
    ikeja
    Feb 2023 - Jul 2024 (1 year 6 months)
    • Core field team member in development of a proprietary 60GHz radio with integrated 2.4GHz and 5GHz hotspot capability
    • Managed all field testing, documentation, and iterative improvement feedback across multiple development cycles
    • Deployed 1 off-grid node, 2 APs, and 64 client installations for live performance testing
    • Contributed feedback that shaped final manufacturing specifications
    • Following 5 months of testing and refinement, IkejaWave proceeded to full manufacturing
  • ikeja
    Tembisa / Ivory Park / Rabie Ridge Small Cells Rollout
    ikeja
    Jan 2023 - Jun 2026 (3 years 6 months)
    • Led design and full deployment of 75 small cell nodes achieving complete area coverage across Tembisa, Ivory Park, and Rabie Ridge
    • Each node: 7 APs per barrel, 60° beam per radio, hotspot enabled on AP1/AP3/AP5 for full 360° coverage, ~550m radius per node
    • All 75 sites fully off-grid DC solar powered
    • Contributed to barrel mount redesign — lighter frame with integrated MikroTik switch, shorter cable runs, improved maintainability
  • ikeja
    Tachyon TNA300 Series Field Testing
    ikeja
    Jan 2023 - Dec 2023 (1 year)
    • Conducted under Ikeja — selected as field test lead for Tachyon's TNA300 60GHz radio prototypes during active product development
    • Deployed test infrastructure and conducted real-world performance evaluation
    • Provided structured field data and feedback that contributed directly to product refinement
    • Tachyon proceeded to mass production following successful field validation
  • ikeja
    MikroTik 60GHz Network Upgrade
    ikeja
    Jan 2022 - Apr 2026 (4 years 4 months)
    • Identified company need for high-speed infrastructure and proposed 60GHz solution using MikroTik Cube radios
    • Designed and deployed a fully off-grid 60GHz site
    • Successfully upgraded 70 clients to 50/20Mbps speeds
    • Identified AP station capacity limitations and escalated findings, directly driving next-phase radio development