L

Leonardo Augusto Niño Garzón

About

Detail

Madrid, Cundinamarca, Colombia

Contact Leonardo regarding: 
work
Full-time jobs

Timeline


work
Job
school
Education

Résumé


Jobs verified_user 0% verified
  • Enel Colombia
    Project Manager, Project Senior Professional
    Enel Colombia
    Dec 2010 - Nov 2015 (5 years)
    Following up and controlling scope, changes orders, budget, cost, and programming to all civil and electromechanical works in the hydroelectric El Quimbo project (Face concrete dam; two Francis Turbines) and all infrastructure needed for compensate communities affected (Resettlements, roads, Bridges, power transmission lines, irrigation systems) using EVM. Construction of main civil works, supply and commissioning of electromechanical equipment, infrastructure replacement, construction of resettlement infrastructure for Hydroelectric El Quimbo 400 MW, Irrigation systems with more than 20 km conduction line extension, Construction of 170 m length of Gallery lining, works of injection from surface and underground, works for drainage measure o
  • A
    Control Engineer
    Alvarado y during
    Mar 2010 - Nov 2010 (9 months)
    Preparing and evaluating national and international biddings, performing follow up and control to all works under execution. Extension of the port at Cartagena refinery; floating port design for loading hydrocarbons at Barrancabermeja`s port. To contribute to develop a new database of budget and cost under ÕPUS program. Budget executed: 2,1 MUSD
  • C
    Control Engineer
    Constructora Ossa López
    Oct 2009 - Mar 2010 (6 months)
    Following up and controlling works development, cost control and subcontractor payments. Construction and maintenance of roads, urban infrastructures, parks, kinder gardner and airport runway. Perform execution under budget, scope, and schedule. Budget executed: 3,2 MUSD
  • C
    Purchasing and logistic Engineer
    CONSTRUCTORA DOUQUEM
    Jun 2007 - Oct 2009 (2 years 5 months)
    Controlling supply chain of equipment, service, and materials. Assuring supply of materials according to work program, cost and budget forecasted. Negotiating commercial conditions and structuring contracts. Construction of three colleges. Perform execution under budget, scope, and schedule. Budget executed: 8,1 MUSD
  • J
    Control Engineer and Administrator
    JUAN CARLOS ZAPATA TRUJILLO
    Dec 2003 - May 2007 (3 years 6 months)
    Preparing and evaluating biddings for new contracts, implementing, and following up Quality control system, validating payments to subcontractors and preparing and documenting billing to client. Road and Bridge construction and rehabilitation. To get Certification and recertification on ISO 9001 and award public and private contracts. Budget executed: 4 MUSD
Education verified_user 0% verified
  • Universidad Viña Del Mar
    MBA
    Universidad Viña Del Mar
    Jul 2016
    Focus on Project Management
  • Universidad distrital
    Industrial Engineer
    Universidad distrital
    Dec 2000
  • Universidad Nacional de Colombia
    Civil Engineer
    Universidad Nacional de Colombia
    Dec 2000