J

Josharon Perkins

About

Detail

Brent, United Kingdom

Timeline


work
Job
school
Education

Résumé


Jobs verified_user 0% verified
  • Fulcrum
    Full Stack Engineer
    Fulcrum
    Jan 2023 - Current (3 years 8 months)
    Project Overview: Led the development of a high-performance fractional real estate investment platform processing 10,000+ daily transactions, creating a secure, user-friendly system for property investors. Key Achievements: • Reduced transaction processing time by 65% through optimized microservices architecture. • Increased platform security with zero security breaches reported since implementation. • Improved user engagement by 42% through an intuitive UI/UX redesign. • Enabled real-time portfolio tracking with less than 50ms latency. Technical Contributions: • Backend Development: Architected robust services using C# (.NET 7), ASP.NET Core, RESTful Microservices, Entity Framework, and SQL Server 2019 to manage fractional ownership w
  • ZenduIT
    Software Engineer
    ZenduIT
    Jan 2017 - Jan 2023 (6 years 1 month)
    Project Overview: Architected a supply chain intelligence platform providing real-time visibility and predictive analytics for logistics operations, processing data from thousands of IoT devices. Key Achievements: • Improved logistics efficiency by 38% through real-time tracking and route optimization • Reduced data processing latency from minutes to seconds for IoT sensor streams • Decreased system downtime by 87% through robust distributed architecture • Scaled system to handle 5x original load without performance degradation Technical Contributions: • Backend Services: Developed C# services with ASP.NET Core, multi-threading, and distributed systems to handle high-velocity data streams. • Frontend Development: Engineered responsive
  • C
    Junior Software Engineer
    CAR CREDIT MASTER
    Jan 2015 - Jan 2017 (2 years 1 month)
    Project Overview: Developed an RFQ automation system for a manufacturer of utility transmission parts, modernizing legacy applications and reducing quotation turnaround time by 70% . Key Achievements: • Decreased quotation processing time from days to hours (70% reduction) Eliminated 95% of data through automation • Improved by 47% through real-time system integration • Reduced operational costs by 32% through efficient workflow automation
Education verified_user 0% verified
  • Rice University
    B.S. in
    Rice University
    Jan 2011 - Jan 2015 (4 years 1 month)