Project Engineer
CONALVIAS S.A
Oct 2011 - Mar 2013 (1 year 6 months)
Construction of six bridges along the roadway communicating the Panamerican Road and Soná in Veraguas state. Five of them were built with a post-tensioned beam system. The other one, being the largest, is 120m long, built with cast in place cantilever construction method (successive segments). In charge of a team of over 70 people, overseeing all aspects related to the project including detailed design, working with tight deadlines, operating under minimal supervision while coordinating the design with all relevant disciplines – including drainage, structures, survey, rolling stock, utilities, architecture, and traffic. Managed a budget of 10M (USD) and kept the project within timescale and budget.