    Jul 2024 - Current (2 years 4 months)
    Managing, planning, programming and executing different personalized clients' home projects, new and remodelings, along with interior designer and architect, fulfilling customers desires of their dream home.
  • U
    Project Engineer
    UNIÓN TEMPORAL PUENTES DEL VALLE
    Jun 2023 - Feb 2024 (9 months)
    Construction of "Juanchito" bridge over the Cauca river, two 200 meter successive segment vehicle bridges, project owned by "Gobernación del Valle del Cauca" in Cali, Colombia.
  • C
    General Manager
    CIDEY S.A.S
    Sep 2020 - Current (6 years 2 months)
    Organizing, coordinating and managing the CENTRO DE IDIOMAS DEL CASANARE institute for English as a Second Language, implementing the AMA A NEW STREET® methodology, to be applied in schools and universities.
  • EDL S.A.S
    Bridge Director
    EDL S.A.S
    Oct 2018 - Sep 2020 (2 years)
    As the Bridge Director, I was responsible for the technical and quality control auditing of over 60 bridges on the "Autopista Conexión Pacífico 1" Concession, which connects Medellín with the Colombian south Pacific, a project owned by the "Agencia Nacional de Infraestructura (ANI)." In addition to overseeing the auditing processes, I utilized Google Workspace and Microsoft 365 to enhance collaboration and documentation efficiency throughout the project, ensuring that all stakeholders were aligned and informed during the auditing phases.
  • C
    Project Manager
    CONALVIAS S.A
    Sep 2016 - Sep 2018 (2 years 1 month)
    As a Project Manager, I oversaw the road restitution and sidewalk construction along the "Transístmica" Avenue, specifically below the metro stations "Pan de Azúcar", "Pueblo Nuevo", and "12 de Octubre", for the project owned by "Metro de Panamá". My role involved constant communication with our client to ensure that their needs were met throughout the project, which enhanced customer satisfaction and project alignment. Additionally, I utilized customer service skills to foster a collaborative environment, ensuring that all stakeholder expectations were addressed effectively. Although JobTread was not directly relevant to my core responsibilities, my ability to manage project timelines and deliverables was crucial in maintaining project mom
  • Constructora Meco
    Project Engineer
    Constructora Meco
    Feb 2016 - Sep 2016 (8 months)
    Completion of eight new bridges, and the reconstruction of eight old ones, all of them included in the "Interamericana Roadway Section 2 Expansion and Reconstruction" between Santiago and David in Panamá.
  • C
    Project Engineer
    CONALVIAS S.A
    Jan 2015 - Jan 2016 (1 year 1 month)
    Fonseca river bridge construction, it is 170.20m long with two 43.9 m spans and one 82.4 m span, included in the "Interamericana Roadway Section 4 Expansion and Reconstruction" between Santiago and David in Panamá.
  • C
    Project Manager
    CONALVIAS S.A
    Sep 2014 - Jan 2015 (5 months)
    Construction of "Los Andes" bus station, including all the works necessary to the inclusion of "Metro Bus" system, Metro and the public roads near the bus station.
  • P
    Project Manager
    Feb 2014 - Oct 2014 (9 months)
    Responsible for the construction of the Maintenance and Repair Building, and Second PowerHouse for the Colon Container Terminal, in the city of Colón. Construction area over 5000 m2 including pavement areas.
  • C
    Project Engineer
    CONALVIAS S.A
    Mar 2013 - Feb 2014 (1 year)
    Participated in the Metro "Linea Uno" construction, finishing all the works regarding roads and sidewalks near the metro stations, working directly on the "Santo Tomás" station.
  • C
    Project Engineer
    CONALVIAS S.A
    Oct 2011 - Mar 2013 (1 year 6 months)
    Construction of six bridges along the roadway communicating the Panamerican Road and Soná in Veraguas state. Five of them were built with a post-tensioned beam system. The other one, being the largest, is 120m long, built with cast in place cantilever construction method (successive segments). In charge of a team of over 70 people, overseeing all aspects related to the project including detailed design, working with tight deadlines, operating under minimal supervision while coordinating the design with all relevant disciplines – including drainage, structures, survey, rolling stock, utilities, architecture, and traffic. Managed a budget of 10M (USD) and kept the project within timescale and budget.
  • C
    Project Engineer
    CONALVIAS S.A
    Jan 2011 - Oct 2011 (10 months)
    Construction of a complete two level junction, consisting of a three clear bridge (90 meters long and 14 meters wide), rising above a roundabout connecting three roadways in Panama City. Both bridge accesses were built with reinforced ground walls. Successfully completed the project within timescale and on budget.
  • C
    Project Engineer
    Conviales Ltda
    Nov 2009 - Jan 2011 (1 year 3 months)
    Managed, controlled and executed several projects all-around Colombia, most of them involving solutions for geotechnical problems including active and passive anchoring. The company specializes in DTH (Down-the-hole) drilling. Responsible for the following projects: • Anchored screen in La Romelia – La Postrera Roadway in Dosquebradas, Risaralda • Anchored Wall in La Postrera Intersection in Santa Rosa de Cabal, Risaralda • Juanambú Slope Stabilization in Cali, Valle (GEOBRUGG System) • Micropile based Wall in Bogotá – Villeta Roadway in Villeta, Cundinamarca • Construction of vertical anchors for a containing wall at the Aeropuerto del Café (Coffee Airport) in Palestina, Caldas
  • "
    Project Engineer
    "Infraestructura del Café"
    Jun 2009 - Oct 2009 (5 months)
    Project engineer to Phase I of San Mateo's Avenue involving the construction of San Fernando's Intersection for MEGABUS massive transport system in Pereira, Risaralda; This project involved constructing of two new bridges, modification of two more and adjusting the intersection for the full operation of the new integrated passenger transport system (MEGABUS).
  • C
    Project Engineer
    Carlos Gaviria & Associates
    Aug 2008 - May 2009 (10 months)
    Construction of La Romelia junction in Dosquebradas, Risaralda. It is a two level clover type junction involving the Simón Bolivar Avenue and the Autopista del Café (Coffee Highway).
  • D
    Engineering Assistant
    Diego Alberto Ríos Cons. Eng.
    Nov 2006 - Jan 2007 (3 months)
    Worked as an engineering assistant on every vacation from University, helping in the study, analysis and solution to different geotechnical problems in several residential and infrastructure projects, including slope stabilizations.
  • D
    Engineering Assistant
    Diego Alberto Ríos Cons. Eng.
    Jul 2006 - Aug 2006 (2 months)
    Worked as an engineering assistant on every vacation from University, helping in the study, analysis and solution to different geotechnical problems in several residential and infrastructure projects, including slope stabilizations.
Education verified_user 0% verified
  • Universidad Nacional de Colombia
    Road & Transport Specialist
    Universidad Nacional de Colombia
    Jan 2007 - Jan 2008 (1 year 1 month)
  • Universidad Nacional de Colombia
    Civil Engineer Degree
    Universidad Nacional de Colombia
    Jan 2003 - Jan 2008 (5 years 1 month)
  • A
    Attended numerous conferences, technical briefings and symposiums related to various civil engineering topics.
    Jan 2003 - Jan 2009 (6 years 1 month)
  • C
    Secondary Education.
    COLEGIO PEDRO URIBE MEJIA
    Jan 1998 - Jan 2002 (4 years 1 month)
  • Centro Colombo Americano
    Courses of English language
    Centro Colombo Americano
    Jan 1997 - Jan 2001 (4 years 1 month)