J

Jessie Langel

About

Detail

Inspector,Superintendent
Conway, Arkansas, United States

Contact Jessie regarding: 
work
Full-time jobs

Timeline


work
Job

Résumé


Jobs verified_user 0% verified
  • S
    Superintendent
    Sentry Electrical Group, Inc.
    Dec 2022 - Mar 2024 (1 year 4 months)
    Assume overall responsibility for all aspects of projects. Provide safety and hands-on leadership to project teams to ensure productivity, efficient use of materials and equipment, and contractual performance of the project. Oversee supervision of total construction effort to ensure the project is constructed following design, budget, and schedule which includes interfacing with client and AE representatives, other contractors, etc. Plan, coordinate, and supervise onsite functions (scheduling, engineering, material control, and may provide day-to-day direction of onsite administrative staff in accounting, purchasing, etc.). Ensure that proper leadership and supervision are provided to our craft employees and/or sub-contractors. Setup a full
  • T
    TRC
    Think Power Solution
    Sep 2022 - Dec 2022 (4 months)
    Tracked jobs progress and updated the logs. Planned and coordinated work for pole loading, spotting, and setting crews. Each job was planned with appropriate safety measures in mind, such as weight limits and falls. Conducted job safety analyses to reduce daily risks for all workers and job site visitors. Kept track of my time daily and helped with the creation of estimates and scope of work statements. Maintained job sites that complied with all company and federal construction safety regulations.
  • A
    Transmission Line Coordinator
    Actalent Transmission Line
    May 2022 - Jul 2022 (3 months)
    Coordinate jobs and manage materials for projects. QAQC Manage projects from start to completion. Inspect job completion to ensure that it meets client expectations. Sign off on the job after completion. Tracked jobs progress and updated the logs. Respond to RFPs and gain final approval on new projects from the director. Planned and coordinated work for crews in charge of pole loading. spotting and setting. Followed the US Occupational Health and Safety Administration's guidelines for installing high voltage equipment, which included wearing gloves and using insulating blankets. Each job was planned with appropriate safety measures in mind, such as weight limits and falls. Conducted job safety analyses to reduce daily risks for all workers
  • P
    General Foreman
    Plaska Transmission Line
    Sep 2021 - Jan 2022 (5 months)
    Tracked jobs progress and updated the logs. Planned and coordinated work for crews in charge of pole loading. spotting and setting. Followed the US Occupational Health and Safety Administration's guidelines for installing high-voltage equipment. which included wearing gloves and using insulating blankets. Each job was planned with appropriate safety measures in mind. such as weight limits and falls. Conducted job safety analyses to reduce daily risks for all workers and job site visitors. Kept track of my time daily and helped with the creation of estimates and scope of work statements. Maintained job sites that complied with all company and federal construction safety regulations.
  • E
    QAQC Manager
    EC SOURCE SERVICES
    Apr 2020 - Oct 2021 (1 year 7 months)
    Conducted supplier risk management assessments to evaluate the gauge program for senior management's planning purposes. Followed up with customers by phone or email after each merchandise sale to answer any last-minute questions. Recommendation Assessed the conditions of hardware and poles shipped to the job and contacted the manufacturer about damage and blemishes through inspection.
  • C
    Superintendent
    Chapman Construction
    Mar 2018 - Apr 2020 (2 years 2 months)
    Managed 20+ workers including groundsmen, operators, apprentice linemen, journeyman linemen, and foremen performing duties in building and maintaining power line areas of construction Devised a professional development plan to help all employees develop and advance their skills. Ensured onsite safety and followed all OSHA regulations through training]. Helped to ensure project coordination and a smooth workflow by coordinating materials, inspections, and contractor actions. Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency. Reviewed plans and inspected ongoing construction to keep work on track with project goals.
  • S
    General Foreman
    Southern Electric Company
    Mar 2018 - Apr 2020 (2 years 2 months)
    Planned work for crews in charge of transmission line maintenance. Kept track of the job's progress and updated the logs. Ensured that teams were properly supplied with materials, tools plans, and supplementary assistance to meet project deadlines Followed the US Occupational Health and Safety Administration's guidelines for insulting high-voltage equipment which included wearing gloves and using insulating blankets. Each job was planned with appropriate safety measures in mind, such as weight limit and fall protection. Used troubleshooting Techniques to identify problems with old or damaged structures. Was in charge of maintaining job sites that complied with all company and federal safety regulations. Performed troubleshooting procedures
  • I
    Assistant Superintendent
    Irby Construction Company
    Dec 1999 - Nov 2016 (17 years)
    In charge of preparation, execution, personnel, safety, and operations in all phases of power line building project operations. Ensured onsite safety and followed all OSHA regulations by inspecting job sites. Reviewed plans and inspected ongoing construction to keep work on track with project goals. Ensured compliance with all relevant regulatory authorities by customers and city government. Developed long-term procedures, defect plans, and risk assessment systems with the help of engineers and consultants, WORK EXPERIENCE
  • H
    Journeyman
    Higher Ground Electric
    Nov 1995 - Dec 1999 (4 years 2 months)
    Strung cables between structures and pulled lines to proper tension from poles, towers, and trenches. Transformers were connected to poles and lines by me. Interpreted drawings, wiring diagrams, flow charts, and written descriptions of project requirements. Replaced the old poles and hardware with new equipment. Kept a clean safety record, with no OSHA-recordable incidents. Kept my knowledge of safety requirements and policies up to date regularly. Transformers, junction boxes, service panels, electrical boxes, switches, and circuit breakers were among the electrical hardware I installed and wired. Used my trade tool knowledge and ability to read and follow blueprints and wiring plans to complete projects. Demonstrated expertise in the use
  • E
    Lineman
    Entergy Arkansas Power and Light
    Jul 1980 - Oct 1995 (15 years 4 months)