Detail

project manager, testing, asembly and integration Software IT
Cordoba, Argentina

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 34% verified
  • f
    Consulting public Remote experience
    freelance
    Aug 2020 - Current (4 years 9 months)
    Different works: Project Plan to show on line Climate Satellite Images on a SCADA system of a Regional Electric Network. Maintenance plans and documents for Automatic Control System of Electrical Substation applying IEC61850. Implementation Plan of an IEC61850 Automatic Control System of Electrical Substations. Migration Plan to the cloud, Risk Analysis of what to move to hosting services and what to keep in local Data-center.
  • Home
    temporary retreat
    Home
    Jul 2015 - Dec 2019 (4 years 6 months)
    - I was a coach to my kids and my husband - take care of my family
  • I
    Ground Segment Engineer - System Engineer verified_user Verified experience
    INVAP S.E. www.invap.com.ar
    Mar 2009 - Jun 2015 (6 years 4 months)
    - 2012: update the office positions from 30 to 100, for a new project, in 3 months. 2014: launch of ARSAT1, and the team of the Satellite Operations and Ground Segment Area command it to the final orbit 100% successfully. - From 2015-2012: 60% Project leader (8 people team) 20% Co-Leader of Satellite Operations and Ground Segment Area (20 people ) 10% local IT Manager (Cordoba Offices, 2 people team) 10% Director of Office Supplies (Cordoba Offices, 4 people team) - From 2012-2009: 80% Project Leader (4 people team) 20% local IT Manager (Cordoba Offices)
  • I
    Ground Segment IT Manager verified_user Verified experience
    INVAP S.E. www.invap.com.ar
    Aug 2000 - Apr 2009 (8 years 9 months)
    - update of: operation procedures, maintenance procedures, design of risk assessments plan, configuration control, alarms and events management. Successfully pass quarterly Security Networks Audits from NASA USA. - IT Manager of high availability Center (7*24) I had the responsibility to keep the IT infrastructure updated and operative 7*24. Support Operators to find problems as soon as possible and guide them to apply the right solution to ensure Satellite command on time.
  • P
    System Engineer
    PROGRAM CONSULTORES S.R.L
    Nov 1998 - Jul 2000 (1 year 9 months)
    - Software Integration and Operation at Bariloche city and Bolson city Municipality - System Engineer Software and IT Integration, data migration, operation, user training.
  • M
    IT Administrator
    Municipalidad de Villa Carlos Paz
    Dec 1996 - Oct 1998 (1 year 11 months)
    - System and Network Updates, Software Update - IT Manager IT manager, keep the IT resources updated and operative.
Education verified_user 0% verified
  • Universidad Católica de Córdoba
    System Engineer
    Universidad Católica de Córdoba
    Mar 1989 - Dec 1994 (5 years 10 months)
Projects verified_user 50% verified
  • I
    Meteorological Radar Control Center (7*24) verified_user Verified experience
    INVAP S.E. www.invap.com.ar
    May 2012 - Jun 2015 (3 years 2 months)
    - Project Leader Definition of client requirements, design of the Control and Operation Center, definition of requirements of Monitor and Control Software, design the Project Plan, Development of the Control Center, Implementation and Integration, turn it operative, operations procedures design, operators training. Design the IT TIER III architecture (without certification) for software, hardware, network, data process, security, operations and layout. I let the project with 8 Radars online.
  • I
    SATVDT Control Center (Digital TV Control Center - 7*24 )
    INVAP S.E. www.invap.com.ar
    May 2010 - Apr 2012 (2 years)
    - Successful Modular Design: I let the project with 50 TV Stations on line monitored and controlled by the SATVDT Control Center. Now they monitor and control 101 TV Stations. The client only add new modules to upgrade the Control and Monitor System. - Project Leader Definition of client requirements, design of the Control and Operation Center, definition of requirements of Monitor and Control Software, design the Project Plan, Development of the Control Center, Implementation and Integration, turn it operative, operations procedures design, operators training. Design the IT TIER III architecture (without certification) for software, hardware, network, data process, security, operations and layout. I let the project with 50 TV Statio