Edwin Rivera

Edwin Rivera

About

Detail

Metro Manila, Philippines

Contact Edwin regarding: 
Flexible work
Starting at USD11.8/hour

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • O
    Country Supply Chain and Operations Manager
    Ocean Bound Plastic Recycling Phils. (Plastic Bank Phils.)
    May 2021 - Nov 2025 (4 years 7 months)
    Oversee and ensure SCM KPI's and deliverables are achieved. Cross functional collaborations with Global and APAC SCM team, sales, procurement, technical, data analytics and finance. Country functions include supplier sourcing- accreditation-audit- procurement. Collaboration with 3PL's. Supply forecasting, warehousing-inventory, shipping and order fulfillment of recycled plastic to EU and US. Fulfilment of EPR Program, special programs and grants.
  • P
    Logistics Supervisor
    PKDF Marketing Corp. (QC Phils)
    Sep 2020 - Mar 2021 (7 months)
    Accountable for the logistics operation, cold chain management, warehousing- inventory, fleet and personnel management, customer service, order tracking- tracing, and national fulfilment of Human Vaccine.
  • A
    Logistics Coordinator
    Al Abbar Aluminum (Dubai, UAE)
    Apr 2013 - May 2020 (7 years 2 months)
    Oversee the Logistics coordination, customs and country boarder communications, export documentation, 3PL fleet booking and dispatching of construction materials, tools, equipment, machines, assets and accessories to project sites. Project handled: Muscat International Airport (Muscat, Oman), Bahrain International Airport (Kingdom of Bahrain)
  • F
    Business Development Manager / Distribution Manager
    First Imperial Cargo Incorporated (Manila, Philippines)
    Sep 2005 - Mar 2013 (7 years 7 months)
    Accountable for warehousing, container-cargo handlings. courier and online shopping order tracking-tracing, delivery fulfilment and customer service. Fleet and personnel management. Cross functional collaboration for sales leads to contract.
  • D
    Business Solution Officer
    DELBROS INC. Supply Chain Solution (Manila, Philippines)
    Jul 2004 - Aug 2005 (1 year 2 months)
    Develops logistics solution and contract, logistics models, operating procedures and standards for existing and prospective clients. Collaborations with sales and development team.
  • Q
    Quality Assurance / Sampling Head, Industrial Engineer Foreman / Internal Quality Auditor- Chairman
    QC Styropackaging Corp. (Manila, Philippines)
    Mar 1997 - Jul 2004 (7 years 5 months)
    Quality Assurance / Sampling Head: Ensures that all manufactured products meets the highest standards of quality, with reference to clients' standards. Industrial Engineer Foreman: Develops machine, production and manpower standards thru motions and time study, productivity improvement and cost analysis. Internal Quality Auditor-Chairman: Accountable for the implementation and regular auditing of QMS (Quality Management Systems). Schedule internal quality audits. Validates reports, corrective and preventive actions for implementations.
  • S
    Material Planner / Industrial Engineer
    Sterling Paper Products ENT. Inc. (Manila, Philippines)
    Dec 1994 - Mar 1997 (2 years 4 months)
    Material Planner: Accountable for raw material planning, Inventory and procurement and scheduling for production use. Industrial Engineer: Develops machine, production and manpower standards thru motions and time study, productivity improvement and cost analysis.
Education verified_user 0% verified
  • Adamson University
    Bachelor of Science in Industrial Engineering
    Adamson University
    Jan 1994
Projects (professional or personal) verified_user 0% verified
  • Plastic Bank
    Supply of recycled PP and HD, PET Plastic Pellets to EU and US
    Plastic Bank
    May 2021 - Nov 2025 (4 years 7 months)
    E2E SCM of recycled plastic to EU and US
  • B
    Bahrain international Airport Project
    Bahrain Ministry of Transportation
    Jun 2018 - May 2020 (2 years)
    As part of the Bahrain International Airport Project, I was responsible for the transportation of construction materials to the project site, ensuring timely and efficient delivery to meet project deadlines. My role involved managing fleet operations and adhering to customs regulations to facilitate smooth cross-border logistics. I utilized my expertise in enterprise resource planning (ERP) and warehouse management systems to optimize inventory management, ensuring that all necessary materials were accounted for and available when needed. Additionally, I applied my knowledge of international trade and supply chain management to coordinate the logistics of material transport effectively. Although data analysis was not a primary focus of my r
  • M
    Muscat International Airport Project
    Muscat Ministry of Transportation
    May 2013 - May 2018 (5 years 1 month)
    Transportation of Construction Material to project site