Diaz Martinez

Diaz Martinez

About

Detail

Services SubDirector at Pandener
Mexico City, Mexico

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • Pandener
    Services SubDirector
    Pandener
    Mar 2026 - Current (8 months)
    As the SubDirector of Service at Pandener, I lead the strategic and operational management of power generation and cogeneration plants powered by natural gas engines above 500 kW. My role focuses on ensuring high performance, reliability and customer satisfaction across multiple energy projects.
  • Equipamiento Vehicular México
    Operations Director
    Equipamiento Vehicular México
    Jan 2026 - Feb 2026 (2 months)
    Executive leader responsible for the efficient management of a company's daily operations and production, ensuring that strategic objectives are met, processes are optimized, resources (human, material, technological) are managed and quality is maintained, acting as the bridge between the strategy of top management and execution in the field, seeking maximum profitability and operational efficiency.
  • PSF Energy
    Operations Director
    PSF Energy
    May 2025 - Feb 2026 (10 months)
    New startup. Energy and O&G projects advisory and consulting. FEED, Procurement, Installation, Commissioning, Operation, Maintenance and On-site repair for Industrial plants. Cogeneration experts.
  • INNIO Group
    Head of Operations
    INNIO Group
    Feb 2022 - Apr 2025 (3 years 3 months)
    Directed service operations in Mexico for Jenbacher engines, ensuring reliability and availability for key energy and industrial customers.
    Achieved +15% operational efficiency through process optimization, reporting digitalization, and strategic spare parts management.
    Led multidisciplinary teams to consistently deliver uptime KPIs above 95%, boosting customer satisfaction and loyalty.
  • INNIO Group
    Senior Service Manager
    INNIO Group
    Nov 2019 - Jan 2022 (2 years 3 months)
    Managed a team of 18+ field engineers across LATAM, coordinating critical interventions on gas engines.
    Implemented technical training programs that reduced response times by 20%.
    Ensured execution of high-value service contracts, strengthening INNIO’s regional footprint.
  • INNIO Group
    Customer Service Manager Sr
    INNIO Group
    Aug 2018 - Oct 2019 (1 year 3 months)
    Responsible for Mexico & Caribbean service operations, resources and logistics required to perform commissioning, preventive and corrective maintenance, troubleshooting and more activities for Jenbacher Gas Engines at customers' site/property.
    Oversaw industrial maintenance contracts for large-scale customers.
    Negotiated service level agreements (SLAs) that optimized availability and reduced operating costs.
  • GE Power
    Customer Service Manager
    GE Power
    Jun 2016 - Jul 2018 (2 years 2 months)
    Responsible for Mexico & Caribbean Indirect market KPIs for Waukesha and Jenbacher P&Ls.
    Managed spares and service contracts, ensuring technical and financial compliance.
    Led improvement initiatives that reduced unplanned downtime by 12%.
    Prepared regional growth strategies for GE transitioning to Direct operations.
  • Dragados Offshore
    Turbomachinery Manager
    Dragados Offshore
    May 2013 - May 2016 (3 years 1 month)
    Led engineering, procurement, construction, commissioning and start-up of 7 turbocompressor SLM trains for the CB-Litoral-A offshore platform.
    Managed multimillion-dollar EPC contracts, ensuring on-time, on-budget, and compliance with international standards.
    Directed multidisciplinary teams both onshore and offshore, consolidating Dragados as a benchmark in integrated compression solutions.
  • GE Oil  Gas
    Project Engineer Leader (Field)
    GE Oil Gas
    Aug 2010 - May 2013 (2 years 10 months)
    Coordinated installation and commissioning projects for turbomachinery across North America and LATAM.
    Delivered execution for strategic energy and oil & gas projects, including Petrobras FPSOs and LNG plants in the US.
  • Solar Turbines
    CHP Plant Manager
    Solar Turbines
    Nov 2008 - Aug 2010 (1 year 10 months)
    Managed the flawless operation and cost-effective maintenance of a 10MW CHP plant featuring a Solar Taurus 70S gas turbine coupled with a Kato alternator and an HRSG system.
    Optimized plant efficiency and reliability through rigorous oversight.
    Built and developed a high-performing team by hiring and training operators and supervisors.
    Implemented fired-hour O&M routines, successfully extending equipment life cycles and minimizing operating costs.
  • Solar Turbines
    Field Services Engineer / O&M Specialist
    Solar Turbines
    Nov 2003 - Oct 2008 (5 years)
    Delivered major maintenance and field service for industrial turbines across Mexico and LATAM.
    Specialized in troubleshooting and failure resolution, ensuring operational continuity for strategic Oil & Gas projects.
Education verified_user 0% verified
  • UNIVERSIDAD ANÁHUAC MÉXICO NORTE
    Master's degree, Dirección de Empresas
    UNIVERSIDAD ANÁHUAC MÉXICO NORTE
    Sep 2023 - Jun 2026 (2 years 10 months)
    My second masters is in Company's Direction
  • universidad aliat
    Master of Business Administration (MBA, Administración de Negocios
    universidad aliat
    Jan 2009 - Jan 2013 (4 years 1 month)
    Primer lugar de la generación - First in class
  • Instituto Tecnológico de Veracruz
    Grado en Ingeniería, Ingeniería mecánica
    Instituto Tecnológico de Veracruz
    Aug 1997 - Jun 2002 (4 years 11 months)
    Bachelor in Science - Mechanical Engineering
Projects (professional or personal) verified_user 0% verified
  • S
    SLM Turbocompressors
    May 2013 - May 2016 (3 years 1 month)
    State-of-the-art Single Lift Modules (SLM) for compression application. First in class project in 3-level module configuration for Dragados Offshore worldwide. Responsible for project FEED, procurement, construction, commissioning and startup of x7-Turbocompressor SLMs in all-new CB-Litoral-A platform.
    SoS: x4-LP trains with Solar Centaur 50L + C50 + C33, and x3-MP trains with Solar Centaut 50 + C33, including Balance of Plant.
    BOP covering yard valves, scrubbers, coolers, turbomachinery and Waste Heat Recovery units.
  • N
    Nikiski HEA - Retrofit for Combined Cycle
    Apr 2013 - May 2013 (2 months)
    Site support during commissioning and startup of GE O&G SAC1-15 Steam turbine to improve Nikiski Power Generation plant from simple cycle to combined cycle.
  • T
    Tupi 4 for SBM / Petrobras
    Mar 2013 - Apr 2013 (2 months)
    BDR, DDR and FMEA preparation and review for Tupi Project.
    GE supplied the FPSO’s builder, SBM Offshore, with four GE LM2500+G4 aeroderivative gas turbines, two turbocompressor trains driven by GE PGT25 gas turbines for carbon dioxide (CO2) compression and six EM driven GE compressors, along with related services, by the end of 2012. The FPSO will work in waters 2,300 meters (7,545 ft) deep and is designed to process 150,000 barrels per day (bpd) of production fluids; to treat 6,000,000 m3/day of associated gases for CO2/hydrogen sulphide removal and compression; and to inject 180,000 bpd water into the ground. Delivery is set for 2014 under a 20-year lease to the consortium developing Guará Norte: Petroleo Brasileiro S.A. (Petrobras),
  • S
    Sabine Pass LNG
    Nov 2012 - Jan 2013 (3 months)
    BDR and FMEA preparation for Sabine Pass LNG project.
    GE supplied 12 PGT25+G4 aeroderivative gas turbines to drive the first two liquefaction trains of the Sabine Pass Liquefaction Project currently under construction. Each train will have the capacity to produce approximately 4.5 million metric tons per annum (mtpa) of LNG.
  • P
    Petrobras P58 & P62 FPSOs for Petrobras
    Oct 2012 - Feb 2013 (5 months)
    DDR review. Technical support during commissioning and startup. Troubleshooting remote assistance for FSEs at site (Macae, Brazil).
    GE project support during engineering phase to supply gas turbines and compressors for PNBV—Petrobras Netherlands BV, subsidiary of Petrobras the integrated oil and gas company, for deployment in two floating production, storage and offloading (FPSO P-58 and P-62) units for exploration and production offshore Brazil.
  • M
    Motiva refinery - Mustang Eng
    Mar 2012 - Jun 2012 (4 months)
    Remote technical assistance to close service requests and project as-built.
    SoS: three (x3) GE Frame 6B gas turbines
    GE Oil & Gas project provided gas turbines for the Motiva Port Arthur Refinery Expansion Project, which will create the largest refinery in USA and one of the top 10 in the world.
  • P
    Pigap III Expansion – Gas Reinjection trains (Venezuela)
    Dec 2011 - Apr 2012 (5 months)
    Pigap III Expansion – Gas Reinjection trains (Venezuela)
  • P
    P-52 FPU for Technip / Petrobras
    Mar 2011 - May 2011 (3 months)
    Remote technical assistance during startup.
    SoS: two compression modules each will encompass three motor compressor trains.
  • C
    Cove Point LNG - Dominion
    Oct 2010 - Dec 2010 (3 months)
    Site technical assistance during commissioning and Startup of GE two Fr5 PGs in Dominion´s Cove Point LNG facility in Lusby, Maryland - USA.
    http://www.genewscenter.com/Press-Releases/GE-Technology-to-Power-Dominion-s-Cove-Point-LNG-Liquefaction-Project-in-Maryland-3f2a.aspx
  • P
    P57 FPSO for SBM / Petrobras
    Aug 2010 - Mar 2011 (8 months)
    Site support during installation, commissioning and start up of x4 PGT25+ Generators to produce 134 MW of energy for SBM P-57 FPSO operation.
  • E
    EPC 78B - Dragados Offshore (Akal-L for PEMEX)
    Mar 2004 - Oct 2004 (8 months)
    Comisionamiento y arranque de x8 Turbobombas Solar Saturn 20 + Sulzer en la Plataforma Akal-L. Contrato de Dragados Offshore IPC-78B
Awards verified_user 0% verified
  • I
    Customer Value Award
    Issued by GE Energy
    Customer Value Finalist for ERD 2011