Richard Marcaccio

Richard Marcaccio

About

Detail

Vice President, Engineering
Providence, Rhode Island, United States

Timeline


work
Job
school
Education

Résumé


Jobs verified_user 0% verified
  • Utilidata
    VP of Technical Operations
    Utilidata
    Jun 2022 - Current (4 years 3 months)
  • Utilidata
    Vice President, Engineering
    Utilidata
    Oct 2018 - Current (7 years 11 months)
    Responsible for the development and support of Utilidata's software products
  • Utilidata
    Director, Quality Assurance & Deployment
    Utilidata
    Feb 2018 - Oct 2018 (9 months)
    Led the QA Team in the Development of Test Plans and automation for testing Utilidata’s AdaptiVolt™ product and led Utilidata’s Service and Support team through scaled deployments and software maintenance.
  • Utilidata
    QA Manager
    Utilidata
    Jul 2013 - Feb 2018 (4 years 8 months)
    Led the QA Team in the Development of Test Plans and automation for testing Utilidata’s AdaptiVolt™ product and managed development projects through their entire life cycle. Designed a Test Lab environment to simulate customer environments Developed and executed Test Plans for Utilidata’s Version 2 platform. Developed a Nightly Build and Test (NBT) that runs a set of regression tests against each new build presented to QA. Developed and documented quality control procedures to be followed for customer deployments. Led multiple cross-functional scrum teams in the development of new features
  • B
    Senior SQA Engineer
    Broadbus Technologies
    Jan 2003 - Jan 2004 (1 year 1 month)
    Developed and executed test plans for Broadbus B1 Video on Demand System. Designed QA Lab to test thousands of mpeg-2 video streams simultaneously. Automated stream testing with command line interface (CLI) with vbscript.
  • C
    Member, Technical Staff
    Celox Networks
    Jan 2000 - Jan 2003 (3 years 1 month)
    Developed and executed test plans for Celox SCX 192 Edge Router Developed customized automated testing tool using SNMP interface. Tested Product GUI interface using WinRunner testing tool. Simulated thousands of users using 3rd party testing tools from vendors such as Agilent Router Tester.
  • Motorola
    SQA Engineer
    Motorola
    Jul 1997 - Aug 2000 (3 years 2 months)
    Developed and executed test plans for both CMTS and Cable Modems Roles and Accomplishments included: Developed test plan for 2nd generation Motorola CyberSurfer Cable Modem which included both hardware and software and integration with 4 different CMTS vendors. Tested Sustaining Releases of CMTS quarterly. Automated Cable Modem performance tests using binary search algorithm.
  • Woodard  Curran
    Instrumentation and Control Systems Engineer:
    Woodard Curran
    Jul 1996 - Jul 1997 (1 year 1 month)
    Designed and Field-Tested Process Control for South Essex Sewerage District Wastewater Treatment Plant. Designed and Field-Tested Control System for Boston’s Combined Sewer Overflow system.
  • CDM Smith
    Instrumentation & Controls Engineer
    CDM Smith
    Jun 1993 - Jul 1996 (3 years 2 months)
    Designed process and control for several municipal water and wastewater treatment plants.
Education verified_user 0% verified
  • Rensselaer Polytechnic Institute
    Bachelor of Science (B.S, Electrical, Electronics and Communications Engineering
    Rensselaer Polytechnic Institute
    Jan 1989 - Jan 1993 (4 years 1 month)
This is a community-created genome.