Greg Liles

Greg Liles

About

Detail

Associate Principal / Director of Technology Consulting @ Mazzetti
Atlanta, Georgia, United States

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • Mazzetti  GBA
    Director of Technology Consulting
    Mazzetti GBA
    Mar 2025 - Current (1 year 5 months)
  • MGAC
    Associate Director / Technology Owner's Rep
    MGAC
    Nov 2023 - Mar 2025 (1 year 5 months)
  • Introba USA Ross  Baruzzini
    Associate Principal, Technology Lead (Southeast)
    Introba USA Ross Baruzzini
    Nov 2021 - Nov 2023 (2 years 1 month)
  • Ross  Baruzzini
    Systems Specialist
    Ross Baruzzini
    May 2020 - Nov 2021 (1 year 7 months)
  • CHI
    Sr. Infrastructure Deployment Architect
    CHI
    Dec 2014 - May 2020 (5 years 6 months)
    Greg provided technology systems engineering oversight and project management on Master Facility Planning, Merger, and Acquisition projects for 150 hospitals and 1500+ clinics nationwide. Greg was also the relationship manager for healthcare facilities in TX, AR, TN, and GA and handled all of the projects in those states. These projects ranged in size and complexity from network and low voltage remediation to a 2.5 million sqft replacement hospital. Some notable projects include: CHI Baylor St. Luke’s Medical Center- McNair Campus Enterprise Wide UPS / IT Power Remediation Enterprise Wide Network Stabilization and Low Voltage Cabling Remediation Enterprise Wide DAS Remediation Design
  • Lockheed Martin Information Technology
    Air Force Reserve Command Voice SME (Subject Matter Expert)
    Lockheed Martin Information Technology
    Sep 2008 - Nov 2009 (1 year 3 months)
    Greg provided expert level telecommunications systems engineering support for 9 Air Force Reserve Bases around the US. His role was to provide designs and expertise for voice systems deployment, troubleshooting, and remediation. These systems ranged in size from 50 to 200,000 users.
  • E
    Project Director/Technology Systems Engineer
    EDI Ltd
    Apr 2007 - Nov 2014 (7 years 8 months)
    Greg’s experience with EDI includes technology systems design, construction/project management, IT Transition Planning, IT Device Planning, and inter-system integration. Below are some examples of Greg's projects: Memorial Health Systems, Glenwood, Chattanooga, TN Memorial Health Systems, Hixson, Hixson, TN Valley Health- Page Memorial, Luray, VA Valley Health- Winchester, Winchester, VA Valley Health- Cancer Center, Winchester, VA Valley Health- War Memorial, Berkley Springs, WV Valley Health- Hampshire Memorial, Romney, WV Ty Cobb Regional Medical, Lavonia, GA The Pines at Davidson, Davidson, NC Childrens' Hospital at Richmond, Richmond, VA Sumter Regional Interim Hospital, Americus, GA Albert Einstein East Norriton Hospital, East Norrito
  • E
    Sr. Telecom Infrastructure Engineer
    EDS Group
    Nov 2001 - Apr 2007 (5 years 6 months)
    Greg initially provided oversight for the CDC's telecommunications systems maintenance. Greg grew into the role of designing and providing project management for structured cabling and telecommunications systems for CDC. Greg completed over 40 renovation projects and new buildings around the US. These buildings varied greatly in scope from BSL4 labs, to TV studios, to world HQ with Emergency Operations Center, to simple office buildings.
  • USMC
    Telephone Switching Equipment and Infrastructure Technician (MOS 2822)
    USMC
    Sep 1994 - Feb 2002 (7 years 6 months)
Education verified_user 0% verified
    Projects (professional or personal) verified_user 0% verified
    • M
      McNair JOA Houston, TX
      Jan 2014 - Current (12 years 7 months)
    • L
      Lufkin Memorial Hospital DAS project
      DAS (cellular signal re-radiation system) for 733k sq ft hospital facility. The project consist of a new single mode fiber optic back bone and BDA/BTS signal source fiber/RF system.
    • M
      McNair JOA Houston, TX Phase 2
      Phase will add a new patient tower with 600 in-patient beds. This project will be supported by the adjoined Phase 1 project 10 story Patient Support Services building.
    • M
      Memorial Chattanooga Hospital MFP Phase 2
      This project consists of a 96 bed patient tower and 16 Surgery suites, patient services support areas. The overall project size was 500k sq ft. The infrastructure build included budget development, bid documentation development, bid management, construction administration, contract management, structured cabling, physical security, nurse call, CATV, Audio/Visual, synchronized clocks, refrigerator temperature monitoring, UPS, distributed antenna, network, WiFi, and IT clinical supported systems.
    • S
      Springwoods Campus MFP
      This project consisted of a new campus build which included a new hospital of 40k sq ft and a medical office building of 80k sq ft. The infrastructure build included budget development, bid documentation development, bid management, construction administration, contract management, structured cabling, physical security, nurse call, CATV, Audio/Visual, synchronized clocks, refrigerator temperature monitoring, UPS, distributed antenna, network, WiFi, and IT clinical supported systems.
    This is a community-created genome.