  • alfanar
    Regional Manager, Maintenance Solution, Central
    alfanar
    Jun 2026 - Current (5 months)
  • alfanar
    Sr. Project Manager
    alfanar
    Mar 2024 - Current (2 years 8 months)
    🚀 Roles and Responsibilities:

    🔹 Effectively managed many projects simultaneously.
    🔹 Developing the project schedules and maintaining timelines, budget, scope, quality, and resources with proactive adjustments to workflow, assuring that every effort is made to meet the project schedule within the budgeted effort hours allotted, with the required quality.
    🔹 Successfully led the procurement of critical project materials, reviewing all engineering, design, and
    schematic drawings, ensuring timely delivery and strict adherence to SEC specifications and quality
    standards. Maintained close coordination with engineering, vendors, and SEC representatives to guarantee compliance and operational efficiency.
    🔹 Pr
  • Alfanar Engineering Services
    Project Manager
    Alfanar Engineering Services
    Mar 2019 - Feb 2024 (5 years)
    ⚙️ Relevant Projects:
    1️⃣ Installation of AMI/AMR for 7 EPC (Kingdom wide) Contracts in "Pumping stations with SWCC, SEC-NG transmission substations for TIE lines between cities, Generation, Distribution in COA, EOA, WOA&SOA, with the Bulk Customers"
    2️⃣ Replacement of Lockout Relays of Distribution Feeders In NGSA-COA
    3️⃣ Construction of PP13, SS# 9040 (380/132/13.8KV) BSP–1800 MW
  • Alfanar Engineering Services
    Commissioning Manager (EHV/HV/MV) Power Substations
    Alfanar Engineering Services
    Nov 2015 - Feb 2019 (3 years 4 months)
    🚀 Roles and Responsibilities:

    🔹 Prepares the Pre-check Plan, Organization Chart Master Plan and Rush Plan (if any).
    🔹 Review the technical reports, documents, designs and cost estimates submitted by the EPC Contractor.
    🔹 Prepare the Pre-Check/Commissioning status report.
    🔹 Identifies resources needed and assigns individual responsibilities.
    🔹 Reviews deliverables prepared by team before passing to client.
    🔹 Monitor and control work processes and activities at site and do the perform the needed corrective and preventive actions to meet the project successful criteria.
    🔹 Ensures all project documents are available, updated, and stored appropriately.
    🔹 Submits timely and accurate invoicing
  • Alfanar Engineering Services
    Commissioning Manager (EHV/HV/MV) Power Substations
    Alfanar Engineering Services
    Nov 2015 - Feb 2019 (3 years 4 months)
    🚀 Roles and Responsibilities:

    🔹 Prepares the Pre-check Plan, Organization Chart Master Plan and Rush Plan (if any).
    🔹 Review the technical reports, documents, designs and cost estimates submitted by the EPC Contractor.
    🔹 Prepare the Pre-Check/Commissioning status report.
    🔹 Identifies resources needed and assigns individual responsibilities.
    🔹 Reviews deliverables prepared by team before passing to client.
    🔹 Monitor and control work processes and activities at site and do the perform the needed corrective and preventive actions to meet the project successful criteria.
    🔹 Ensures all project documents are available, updated, and stored appropriately.
    🔹 Submits timely and accurate invoicing
  • Alfanar Engineering Services
    Sr. Testing & Commissioning Engineer
    Alfanar Engineering Services
    May 2012 - Oct 2015 (3 years 6 months)
    🚀 Roles and Responsibilities:

    🔹 Leading the commissioning team through the project’s lifetime.
    🔹 Prepare short-term & long-term plans.
    🔹 Prepare site progress reporting, including daily reports and schedule updates.
    🔹 Site conflict management and team building.
    🔹 Site meetings management, including agenda and MOM.
    🔹 Prepare Site safety requirements, including SEC Safety 5 Stars.

    ⚙️ Relevant Projects:

    1. SEC–COA Substation (9023) – (380/132/13.8)kV – PP10 in Riyadh.
    2. SEC–COA Substation (9005) – (380/132/13.8) kV.
    3. KAFD Substation (8194) – (132/13.8) kV.
    4. SEC-WOA ISKAN SS 132/33/13.8KV - Jizan.
    5. SEC-WOA MAKKA NORTH SS 380/110/13.8KV.
    6. SEC-COA W
  • Alfanar Engineering Services
    Electrical Protection Engineer
    Alfanar Engineering Services
    Jan 2010 - Apr 2012 (2 years 4 months)
    🚀 Roles and Responsibilities:

    🔹 Testing and commissioning for all substation components, including protection panels in the control
    room, LCC, GIS, auxiliary system, and remote end live substations.
    🔹 Ensure all drawings are red-lined and amended correctly before returning to close out the team before delivery.

    ⚙️ Relevant Projects:

    1️⃣ SEC–COA Substation SS 8839 - 132/13.8KV Al Zulfi.
    2️⃣ SEC-WOA ISKAN SS 132/33/13.8KV - Jizan.
    3️⃣ KAFD Substation (8194) – (132/13.8) kV.
    4️⃣ SEC–COA Substation 9005 – 380/132/13.8KV
    5️⃣ SEC–COA Substation (9023) – (380/132/13.8) kV – PP10 in Riyadh
Education verified_user 0% verified
  • A
    Bachelor's degree Electrical Engineering (Power and Machines)
    Assuit university
  • Anglia Ruskin University
    Master of Business Administration - MBA Business Administration and Management General
    Anglia Ruskin University
  • Anglia Ruskin University
    Master of Business Administration - MBA Business Administration and Management, General
    Anglia Ruskin University
Projects (professional or personal) verified_user 0% verified
  • T
    Testing & Commissioning Project Manager At Al Remal BSP # 9046(380/132/13.8KV)
    Jul 2021 - Aug 2022 (1 year 2 months)
  • C
    Construction of new Zulfi SS 8839 - 132/13.8KV
    Apr 2014 - Oct 2015 (1 year 7 months)
  • C
    Construction of Kamassen SS 8783 Wadi Al Dawassier - 132/33/13.8 kV
    Sep 2013 - Mar 2014 (7 months)
  • C
    Construction of Iskan Al Hasmah - Jazan - 132/13.8KV
    Jan 2013 - Aug 2013 (8 months)
  • C
    Constuction of King Abdullah financial center Substations SS 8194/8193 - 132/13.8kV
    Oct 2012 - Dec 2012 (3 months)
  • C
    Construction of PP10 Substation SS 9023 - 380/132/13.8KV BSP
    Jan 2010 - Sep 2012 (2 years 9 months)