O

Oswaldo Borjas

About

Detail

Project Manager at GreenPages / Mechanical Engineer
Venezuela

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • G
    Project Manager
    GreenPages Technology Solutions
    Jul 2022 - Current (4 years 2 months)
  • Teltonika
    Sales Consultant
    Teltonika
    Jan 2022 - Jul 2022 (7 months)
    - Responsible for promoting products, sales and closing business in Networks division in Puerto Rico, Dominican Republic, Jamaica, Trinidad & Tobago and the rest of Caribbean Islands.
  • G
    Production Engineer
    GPB Neftegaz Services B.V.
    May 2018 - Jan 2022 (3 years 9 months)
    - Specialist in Artificial lift systems using Echometer Technology. - Responsible of Dynamometer tests and acoustic Liquid Level tests in artificial lift systems (ALS) such as Rod pump and Progressive Cavity Pump (PCP), using specialized AL software TAM. - Diagnose, analyze and optimize artificial lift wells through pump card and acoustic liquid level test interpretation. - Analysis of surface equipment and Troubleshooting issues in ALS. - Provide technical support to Applications Engineers in the analysis and optimization recommendations in AL wells.
  • E
    Project Coordinator
    Equipos y Servicios Industriales Metalmecanicos, C.A.
    Aug 2016 - Oct 2017 (1 year 3 months)
    - Project management regarding heat exchangers and pressure vessels construction. - Provide support to the professional team from the beginning to the end. - Responsible for planning and achieve the objectives of assigned projects. - Main responsible of procurement team (international market) for 4 months.
  • A
    Project Engineer
    Ariadna Ingenieria, Construccion y Sistemas, C.A.
    Dec 2015 - May 2016 (6 months)
    - Elaborar y desarrollar los productos (planos y documentos) de ingeniería mecánica, en la fase conceptual, básica y detalle, que cumplan con los requerimientos generales del proyecto. - Los estándares establecidos en las normas nacionales e internacionales y con las necesidades del cliente. - Realizar levantamiento de información en campo, a fin de recopilar información técnica. - Realizar cálculos correspondientes a la disciplina y análisis de resultados, a fin de diseñar productos con la calidad esperada por el cliente. - Manejar el tiempo y la coordinación de un determinado proyecto dentro de la disciplina, a fin de cumplir con la planificación del mismo. - Mantener relación con los proveedores, a fin de dar información oportuna del pro
  • T
    Quality Control Intern
    TURBOCARE CA
    Feb 2015 - Mar 2015 (2 months)
    - Prepare a review and correction of Thermal Barrier Coatings (TBC) manuals applied to W-501 Gas Turbine components. - Preparation of a presentation with recommendations and corrections in the manuals and instructions associated with W-501 turbine thermal coatings. Prepare a review and correction of Thermal Barrier Coatings (TBC) manuals applied to W-501 Gas Turbine components. Achievements: Preparation of a presentation with recommendations and corrections in the manuals and instructions associated with W-501 turbine thermal coatings. Elaborar revisión y corrección de los manuales de los recubrimientos térmicos (TBC) aplicados a componentes de Turbinas W-501.
Education verified_user 0% verified
  • C
    Diplomatura, Ingeniería mecánica
    Centro de Estudios del Desarrollo de la Universidad Central de Venezuela
    Jan 2017
  • Universidad del Zulia
    Ingeniero, Ingeniería mecánica
    Universidad del Zulia
    Jan 2010 - Jan 2016 (6 years 1 month)
  • U
    High School Diploma
    U.E Nuestra Señora de Chiquinquirá. H.H. Maristas
    Jan 2003 - Jan 2009 (6 years 1 month)
Projects (professional or personal) verified_user 0% verified
  • F
    Formula SAE-LUZ
    Sep 2013 - Nov 2015 (2 years 3 months)
    Design, construction and test of a small Formula-style racing car based on SAE international rules.Teamwork and leadership in the group. Responsibilities included managing and training a group.