Musaib Dabholkar

Musaib Dabholkar

About

Detail

SENIOR MEP BIM MODELER
Dubai, United Arab Emirates

Contact Musaib regarding: 
work
Full-time jobs

Timeline


work
Job
school
Education

Résumé


Jobs verified_user 0% verified
  • Meinhardt Group
    MEP BIM MODELER
    Meinhardt Group
    Dec 2024 - Current (1 year 10 months)
  • Studio International Engineering Consultants
    SENIOR MEP BIM MODELER
    Studio International Engineering Consultants
    Feb 2023 - Dec 2024 (1 year 11 months)
  • Masah Specialized Construction Co.
    SENIOR MEP BIM MODELER
    Masah Specialized Construction Co.
    Dec 2021 - May 2022 (6 months)
    Dr.Sulaiman Al-Habib Medical Services Group Company plans to develop Al Sahafa Dr. Sulaiman Al-Habib Hospital in yasmine neighborhood, King Fahd Road with Anas Bin Malik and Al Alia Road, Sahafa District, Riyadh Province, Saudi Arabia. The project will include the construction of a 25 storey hospital over a land area of 46,000 sq.m and will compose of 400 beds and other related facilities. Consolidated Consultants Group. is the design, lead design and structural design consultant.
  • Saudi Technical Group of Companies
    SENIOR MEP BIM MODELER
    Saudi Technical Group of Companies
    Mar 2019 - Jan 2022 (2 years 11 months)
    Saudi British Bank (SABB) The SABB head office will be a 46,544-SM commercial office development comprised primarily of a 135-m tall office tower. A supporting podium is integrated and connected to the tower housing 7,013-SM of banking services, food and beverage areas and employee training facilities.
  • ALEC
    Senior mep bim modeler
    ALEC
    Mar 2018 - Mar 2019 (1 year 1 month)
    Dubai Hills mall
  • KEO International Consultants
    MEP BIM MODELER
    KEO International Consultants
    Nov 2017 - Mar 2018 (5 months)
    DEWA Headquarters Office Building in Al Jadaf (UAE) Dubai Electricity and Water Authority (DEWA) has started construction of a new headquarters. The new building, named Al-Sheraa (Arabic for sail), will be the tallest, largest, and smartest net Zero Energy Building (ZEB) in the world. The Al-Sheraa building will have over a million square feet, over 200,000 square feet of land. It is being built in the heart of the Cultural Village in Al Jadaf. This latest achievement conforms Dubai’s global position as a role model for leading organisations in sustainability, innovation, and shaping the future. Show less
  • KEO International Consultants
    MEP BIM MODELER
    KEO International Consultants
    Aug 2016 - Feb 2018 (1 year 7 months)
    DUBAI EXPO 2020 The project's scope of work consists of a five 16-storey towers. Three of the towers are conjoined through a mutual three-storey podium, and the other two towers are also co-joined through a shared three-storey podium. The residential community village located at Expo 2020, Dubai
  • KEO International Consultants
    MEP BIM MODELER
    KEO International Consultants
    Jun 2016 - Jan 2017 (8 months)
    AYKON CITY Located on Sheikh Zayed Road, AYKON City is a six tower luxury project comprising Dubai's first all-suites, 80 storey AYKON Hotel and Residences, a 63 storey DAMAC Maison Serviced Hotel Residences, a 60 storey apartment tower, a 65 storey office tower and two 30 floor ultra-luxury residential towers featuring state-of-the-art car lifts to each unit and direct views over Dubai Canal and Safa Park.
  • Drake & Scull International PJSC
    REVIT BIM MODELER
    Drake & Scull International PJSC
    Mar 2013 - Apr 2015 (2 years 2 months)
    KAPSARC projects in KSA is the USD 2 Billion King Abdullah Petroleum Studies and Research Centre (KAPSARC). Designed by Zaha Hadid, KAPSARC is a LEED Platinum project with very complex, detailed design specifications.
  • XS CAD LIMITED
    MEP Revit Modelar
    XS CAD LIMITED
    Oct 2011 - Mar 2013 (1 year 6 months)
    St Joes Hospital is an 800,000 sq. ft. healthcare facility featuring an academic centre with a 200-seat amphitheatre, a library, auditoriums, meeting rooms, a patient unit for mental health and complex care, in-patient wards and rooms, operating theatres, and outpatient clinics. Responsible for the creation of a fully coordinated BIM model utilising the Revit MEP platform. Our scope included 3D modeling, coordination and issue of coordinated drawings and single services sheets for all building services within the site including prefabricated ceiling modules Show less
Education verified_user 0% verified
  • I
    Industrial Training Institute Ratnagiri — Mechanical Drafting and Mechanical Drafting CAD/CADD
    Industrial Training Institute Ratnagiri
    Jan 2007 - Dec 2009 (3 years)
This is a community-created genome.