Dilshad Ali

Dilshad Ali

About

Detail

Structural Engineer | RIL Nagothane | Planning & Execution of Pipe Rack and Sleeper Structures - Onshore Project
Abu Dhabi, United Arab Emirates

Contact Dilshad regarding: 
work
Full-time jobs

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • Larsen  Toubro
    Planning Engineer
    Larsen Toubro
    Feb 2026 - Current (9 months)
    Responsible for structural planning and execution of pipe rack and sleeper structures for industrial facilities at RIL Nagothane.

    Study and interpret structural drawings, specifications, and IFC documents
  • Saipem
    Technical Project Coordinator
    Saipem
    Oct 2024 - Current (2 years 1 month)
    In my role at Saipem, I was responsible for coordinating piping and E&I systems across various offshore work fronts. I managed vendor deliverables and facilitated communication between engineering teams and subcontractors. Regular site inspections allowed me to address challenges swiftly, ensuring project timelines were met and maintaining high standards of quality.
  • Aramco
    Support Specialist
    Aramco
    May 2023 - Current (3 years 6 months)
  • A
    Project Supervisor
    Aramco Asia India
    May 2023 - Sep 2024 (1 year 5 months)
    • Oversaw fabrication, piping layout, and installation as a client representative.
    • Coordinated with EPC contractors and vendors to ensure timely delivery and compliance.
    • Conducted detailed inspections to adhere to ASME, API, and project specifications.
    • Reviewed progress reports to maintain transparency in contractor performance tracking.
  • GL Events
    Project Engineer
    GL Events
    Sep 2022 - Jan 2023 (5 months)
    • Oversaw the execution of the Corniche activation for the FIFA World Cup 2022 in Doha, Qatar.
    • Negotiated with vendors to ensure timely delivery of temporary setups.
    • Managed installation processes while adhering to strict deadlines.
    • Contributed to a seamless event experience, reflecting GL events' commitment to excellence in event management.
  • Nesma United Industries
    Project Secretary
    Nesma United Industries
    Dec 2018 - Dec 2019 (1 year 1 month)
    Maintaining and monitoring project plans, project schedules, work hours, budgets and expenditures. Organizing, attending and participating in stakeholder meetings. Documenting and following up on important actions and decisions from meetings. Preparing necessary presentation materials for meetings. Ensuring project deadlines are met. Determining project changes. Providing administrative support as needed. Undertaking project tasks as required. Developing project strategies. Ensuring projects adhere to frameworks and all documentation is maintained appropriately for each project. Assess project risks and issues and provide solutions where applicable. Ensure stakeholder views are managed towards the best solution. Chair and facilitate meeting
  • SALINI IMPREGILO
    Executive Assistant
    SALINI IMPREGILO
    Jun 2015 - Aug 2017 (2 years 3 months)
    Preparing financial statements, reports, memos, invoices letters, and other documents. Answering phones and routing calls to the correct person or taking messages. Handling basic bookkeeping tasks. Filing and retrieving corporate records, documents, and reports. Researching and conducting data to prepare documents for review and presentation by boards of directors, committees, and executives. Helping prepare for meetings. Accurately recording minutes from meetings. Greeting visitors and deciding if they should be able to meet with executives. Using various software, including word processing, spreadsheets, databases, and presentation software. Reading and analyzing incoming memos, submissions, and distributing them as needed. Making travel
Education verified_user 0% verified
  • Chatrapati Sahuji Maharaj Kanpur University Kanpur
    Bachelor's degree, Mechanical Engineering
    Chatrapati Sahuji Maharaj Kanpur University Kanpur
    Jun 2019 - Jun 2023 (4 years 1 month)
    • Project Tools: Primavera P6, MS Project, AutoCAD, SolidWorks
    • Document Control: SharePoint, Procore
    • Office Tools: Excel (Pivot Tables, Formulas), Word, PowerPoint
    • Engineering Standards: ASME, ASTM, API
    • Systems Knowledge: Piping, HVAC, offshore structures, hydrotesting
Projects (professional or personal) verified_user 0% verified
  • S
    SAFANIYA, ZULUF & RABYAN JACKETS under BI-12-19000 /12-22000- 30JACKETS PROJECT- CRPO# 88,898: 90
    May 2023 - Current (3 years 6 months)
    Acted as client representative overseeing fabrication, piping layout, and installation supervision. Coordinated with EPC contractors and vendors to ensure timely delivery and technical compliance. Ensured strict adherence to ASME, API, and project specifications through detailed inspection regimes. Reviewed daily and weekly progress reports ensuring transparent contractor performance tracking. Monitored project milestones ensuring timely completion of all deliverables and documentation.
  • T
    Three (3) Jackets & Five (5) Decks with associated subsea facilities in Zuluf Field; Two (2) Oil PDMS & One (1) Water In
    Dec 2018 - Dec 2019 (1 year 1 month)
    Lead coordination of piping and E&I systems across multiple offshore work fronts ensuring design-construction alignment. Manage vendor deliverables for pipeline components, valves, supports, and instrumentation packages. Facilitate interface between Aramco engineering teams, subcontractors, and site execution personnel. Review and approve material submittals, technical drawings, and ensure timely procurement and installation. Conduct regular site inspections, resolving engineering and construction challenges promptly. Generate and present detailed progress reports to project management and client representatives.
This is a community-created genome.