  • Parsons Corporation
    Project Manager
    Parsons Corporation
    Apr 2026 - Current (7 months)
    Appointed by Neom Senior Leadership to serve as the designated Project Manager for the Oxagon industrial ecosystem. In this dual-capacity role, I bridge the gap between technical engineering excellence and strategic project delivery.
    Key Responsibilities:
    Project Leadership: Leading the delivery of critical infrastructure packages within Oxagon, ensuring alignment with Neom’s vision and standards.
    Stakeholder Management: Serving as the primary point of contact for Neom leadership as Senior Subject Matter Experts (SMEs) to streamline decision making and project milestones.
    ● Engineering Oversight: Managing multi disciplinary teams to resolve complex engineering challenges while maintaining strict quality and safety benchm
  • Parsons Corporation
    Design Manager and Construction Manager
    Parsons Corporation
    Feb 2024 - Current (2 years 9 months)
    Responsible for the design management for all potable water projects for Oxagon NEOM and providing technical support for all site technical queries/matter for NEOM Oxagon pipeline projects. In addition to this role, also assigned to handle contractors for site construction as Construction Manager. Nominated as best employ of the Parsons for year 2023 and win GAME CHANGER DRIVE AWARD of Parsons corporations. 1. Managing SSJV design consultant for site wide Oxagon Potable water network for Port, Oxagon ,NEOM Green Hydrogen company. Design Package have several permanent & temporary potable water pipeline projects starting dia 300 to 800 mm. 2. Managing ENOWA potable water projects in across Oxagon NEOM for Air Product & NGHC permanent & temp
  • Parsons Corporation
    Construction Manager
    Parsons Corporation
    Mar 2023 - Feb 2024 (1 year)
    Responsible for the management for overall project construction (Civil, mechanical and E&I) activities and completed below projects.

    1- Construction of 7 Km 1200 mm dia pipeline project.

    2- Removal/ dismantling 7 km 1200 mm dia Pipeline project.

    Below are currently ongoing projects.

    1- Construction of 11.5 Km 1200 mm dia pipeline project
    2- Removal/ dismantling 11.5 Km 1200 mm dia Pipeline project.
    3- Cut & Cover Tunnel earth work.
    • Plans and supervises the major functions of the construction which include the responsibility to monitors contractors at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contac
  • Diversified Lines Petroleum Services DLPS
    Project Manager
    Diversified Lines Petroleum Services DLPS
    Jan 2020 - Feb 2023 (3 years 2 months)
    Worked as Project Manager for an EPC (Saudi Strategic Storage Program -5)
    Pipeline Project BI-10-10056 of Saudi Aramco.
    Engineering, Procurement, construction & commissioning of 12-inch 24 Km pipeline, Surge skids stations,
    Scrapper launcher facility with control valves, Tie-ins with Aramco facility, security system, Building for
    telecommunication equipment’s & DCS system. As a Project Manager administering overall project, managing
    all sub-contractors, vendors, site construction team, design sub-contractor (Jacobs Zate) team, local government
    institutions & coordinating with Saudi Aramco PMT team for all techno commercial resolutions.
    • Prepared project internal budget to control cost and to overview proj
  • E
    Project Development Manager & Head Mechanical
    Etihad Power Generation Limited
    Mar 2017 - Jan 2020 (2 years 11 months)
    Administered a $120 million EPC (Engineering, Procurement, Construction) contract at EPGL as Project Development Manager for plant construction & commissioning.The plant of EPGL consists of two units of 37.2 MW. Each unit comprises of one (1) 190 TPH boiler along with other auxiliaries & one 37.2 MW Turbo generator.
    • Manage & Monitor Project interfaces ensuring the project plan is successfully integrated.
    • Liaison with EPC and the Consultant team to ensure all financial & technical requirements are captured and meet the demands of our employer requirements.
    • Hold regularly scheduled construction review meetings with the EPC contractor identifying problem areas and agreeing on corrective action to be taken.
    • Construc
  • ICI Pakistan
    Mechanical Construction & Commissioning Manager
    ICI Pakistan
    Nov 2014 - Mar 2017 (2 years 5 months)
    Worked at ICI Pakistan Soda Ash Business Khewra as Mechanical Construction Manager during Plant construction and Commissioning & maintenance Manager during Plant Commissioning for following 03 Projects.

    1-Successfully completed Construction and Commissioning of Coal fired (CFB) power plant 18 MW
    ($50 million Non-EPC ,Green field Project)

    2-Successfully completed Engineering ,Construction of Light Soda Ash Expansion of 75 KTPA Project Phase-1 ($100 million Non-EPC ,brown field Project)

    3-Successfully completed Construction & commissioning of Expansion of Dense Ash Plant having capacity of 84000 Tons per Annum ( ($35 million Non-EPC ,brown field Project))
    • Construction review of contractor’s plan
  • Descon Integrated Project pvt Ltd
    Lead Mechanical & Lead Commissioning Engineer
    Descon Integrated Project pvt Ltd
    Feb 2010 - Nov 2014 (4 years 10 months)
    Worked as Lead Mechanical & Lead Commissioning Engineer for an EPC $450 million project of combined cycle power plant with 404 MW Power generation capacity. Plant was Green field with Joint venture of Hyundai Engineering Ltd (Korea) and Descon Engineering Ltd Pakistan. Project owner was world largest Power company GDF SUEZ and owner Engineers was URS America/England.
    • I was responsible for Construction,Erection & Commissioning activities, Trouble shooting during Operation.
    • Provides Project and Management support to Lead project execution, completion of safety and technical reviews, provision of construction supervision, support equipment check-out and commissioning, facilitate Pre Start up Safety Review.
    • Installation, c
  • Descon Integrated Projects Limited DIPL
    Project Engineer
    Descon Integrated Projects Limited DIPL
    Nov 2009 - Oct 2011 (2 years)
    Worked as a Project & Commissioning with DESCON EPC for the Plant erection ,Commissioning & Start-up activities of 225 MW Bhiki Combined Cycle Power Plant. It was a brown field EPC Project with cost of $250 Million.

    RESPONSIBILITIES:
    • Coordinates periodic checks and adjustments and maintains follow up on all operational and maintenance activities in operating area
    • Erection ,Commissioning & start-up of 2 boilers (HRSGS) each having capacity of 126 tons/hr for steam including HRSG Feed water pumps (HP & LP); HP & LP steam distribution & Vent systems.
    • Commissioning & start-up and operation of demineralize water plant for the Combined Cycle power plant (CCPP) facility use.
    • Erection & Commissioning , star
Education verified_user 0% verified
  • Dawood University Of Engineering And Technology
    Chemical Engineering, Oil & Gas and Power Plants
    Dawood University Of Engineering And Technology
    Jan 2005 - Dec 2009 (5 years)
Projects (professional or personal) verified_user 0% verified
  • U
    UCH-II Power Plant Expansion Project
    May 2011 - Mar 2013 (1 year 11 months)
    It is successful project for a Combine Cycle Power Plant. We are worked in consortium with Hyundai Engg. Korea, as a Consortium. My role is Engineering Manager for Descon’s scope of work which includes all interfaces in Main Plant equipment and Balance of Plant. My company’s direct scope of design a supply includes Raw water supply, pretreatment and clarification system, Demineralization Plan, Storage Tanks and Ponds, Waste Treatment Systems, Fuel Oil storage and handling facilities, Fuel gas treatment system etc. Coordination work is tremendous due to consortium atmosphere.
  • I
    INSTRUMENTATION & DESIGNING OF LPG RECOVERY PLANT
    Oct 2009 - Jan 2010 (4 months)
    The project involved the selection of flow scheme and designing of equipments.
  • H
    HALMORE 225 MW CCPP Pakistan
    • Responsible for the supervision of constructional activities.
    • Responsible for the operational activities of HRSG, bypass and other BOP’s from field, DCS and CCR side.
    • Assisting in resolving site technical queries, field instruments installation, terminations, testing/ calibration, troubleshooting and commissioning.
    • Understanding of all electrical and instrumentation drawings, systems analysis and design.
  • L
    Light Soda Ash- 75 KTPA Plant Expansion- Project
  • L
    LSA 75kTPA Expansion Project
  • 1
    18MW Power Generation Plant Based on Coal / Alternate Fuel
  • 1
    18MW Power Project Based on Coal Fired Boiler(CFB).
  • 4
    404MW Uch II Power Project
    EPC Project for 404 MW, Low BTU Natural Gas Fired Combined Cycle Power Plant.
  • U
    UCH II Expansion Project
    400 MW Capacity Combine Cycle Power Plant including two (2) GE Gas Turbines, One (1) Steam Turbine, Two (2) Heat Recovery Steam Generators & associated Auxiliaries and Balance of Plant. Descon Integrated Projects (Pvt.) Limited (DIPL) was part of the consortium with Hyundai Engineering Company (HEC) for the execution of this project.