A

Anali Angulo

About

Detail

Baja California, Mexico

Timeline


work
Job
school
Education

Résumé


Jobs verified_user 0% verified
  • G
    Project Manager
    Gran Peninsula
    Jul 2012 - Mar 2024 (11 years 9 months)
    Shipyard's representative, responsible for vessel's schedules, material selection, orders and traceability, supervisor for specific welding works, plumbers, painters, carpenters, machinists, conducted crane operations and other general shipyard services, overseeing shipyard employees on board vessels, leading contractors, monitoring of all vessel projects and decision making, direct contact between ship owner's representatives, managing reports and appropriate documentation, conducted load tests for boat's cranes, rails ad lashing points, carried dye penetrant tests on weldings, propeller hubs and shafts, operator of cnc cutting machine.
  • M
    Quality Control Manager
    Metalmec Rice Nozzles
    Jul 2012 - Jun 2013 (1 year)
    Responsible for quality control processes for nozzles, rudders, shafts and other structural elements fabrication, reviewed, interpreted and applied welding rules and codes from ABS, BV, DNV, Lloyd's and RINA to ensure elements certification, organized company's Welding Procedure Specifications and Records and Welders Qualification Records for ABS.
  • S
    Engineering Department
    Servicios Portuarios
    Jul 2012 - Jun 2013 (1 year)
    Developed lines, general arrangements, safety and fire plans, inclining procedures for stability records, Organized Company's Welding Procedure Specifications and Records and Welders Qualification Records approved by ABS.
  • Lindblad Expeditions
    Ship Superintendent
    Lindblad Expeditions
    Jul 2012 - Jun 2013 (1 year)
    Responsible for the maintenance and operation of all technical and safety equipment on board Company's Galapagos fleet vessels: M/V National Geographic Endeavour II and M/V National Geographic Islander, responsible of the technical conversion of EX – M/V Crystal Esprit now M/V National Geographic Islander II, supported deck and engine departments of each vessel on purchasing and budget control as well as tracking expenses during the conversion of Islander II. Responsible of scheduling dry-dockings and wet-dockings, planning vessels refurbishments in cooperation with other departments, conducting ship checks to develop shipyard specifications for dry docking and repair periods.
  • P
    Marine Coatings Technical Representative
    Pro Comex Mazatlan
    Dec 2011 - Jul 2012 (8 months)
    Supervised surface preparation and coating processes, provided technical assistance, estimated areas and materials required for coating hulls, decks, tanks and other projects.
  • G
    Shipyard's Manager Assistant
    Grupo Peredia e Hijos Drydock
    Mar 2007 - Aug 2007 (6 months)
    Assisted on areas, weight and cost estimation for steel fabrication and repair on different commercial vessels.
Education verified_user 0% verified
  • I
    Naval Engineering - Maritime Inspection/Survey
    Instituto Tecnologico de Mazatlan
    Jan 2007 - Jan 2012 (5 years 1 month)