A

Adriano Cesário

About

Detail

Gerente de Operações I Manutenção I Comissionamento I Obras I Serviços - Energias Renováveis
State of Bahia, Brazil

Timeline


work
Job
school
Education
folder
Project

Résumé


Jobs verified_user 0% verified
  • Vestas
    Deputy Site Manager
    Vestas
    Aug 2024 - Current (2 years 1 month)
    Site Execution Management Pre-Installation Site Readiness - Offshore Preservation of WTG with long-term storage Pre-Commissioning V174 - Offshore
  • Statkraft
    Regional O&M Engineer - Wind
    Statkraft
    Oct 2021 - Oct 2022 (1 year 1 month)
  • Invenergy
    Manager, Renewables O&M - Brazil
    Invenergy
    Dec 2022 - Jul 2024 (1 year 8 months)
  • FieldCore
    Technical Field Advisor - Commissioning
    FieldCore
    Nov 2019 - Jul 2021 (1 year 9 months)
  • MHA ENGENHARIA
    Electrical Designer - Oil & Gas
    MHA ENGENHARIA
    Jan 2009 - Mar 2011 (2 years 3 months)
  • Rio Energy Projetos de Energia
    O&M Site Manager - Wind
    Rio Energy Projetos de Energia
    Jul 2015 - Apr 2019 (3 years 10 months)
  • FieldCore
    Technical Field Advisor - commissioning Wind Turbines
    FieldCore
    Mar 2011 - Jul 2015 (4 years 5 months)
  • Nacional Gás
    Maintenance Technician - Oil & Gas
    Nacional Gás
    Jul 2004 - Feb 2006 (1 year 8 months)
  • Enercon
    Technical Site Specialist - QA/QC
    Enercon
    Feb 2006 - Jan 2009 (3 years)
  • Neoenergia  Iberdrolas Subsidiary
    Electrical Designer - Electric Utility
    Neoenergia Iberdrolas Subsidiary
    Feb 2000 - Jul 2004 (4 years 6 months)
  • Electric Utility Company  COSERN
    Student Intern
    Electric Utility Company COSERN
    Jan 1997 - Jan 1998 (1 year 1 month)
Education verified_user 0% verified
  • Faculdade Única
    Postgraduate Degree
    Faculdade Única
    Jan 2019 - Dec 2020 (2 years)
  • UNINTER
    Bachelor's degree
    UNINTER
    Jan 2017 - Dec 2021 (5 years)
  • UNINTER Centro Universitário Internacional
    Associate's degree
    UNINTER Centro Universitário Internacional
    Jan 2014 - Dec 2016 (3 years)
  • IFRN
    Technician
    IFRN
    Jan 1994 - Dec 1998 (5 years)
Projects (professional or personal) verified_user 0% verified
  • T
    TPC II ZN26
    Aug 2024 - Dec 2025 (1 year 5 months)
    Taiwan Power Company Offshore Wind Farm Phase II – Zone 26 (TPC II ZN26) Located off the coast of Changhua, Taiwan, this offshore wind project is a key milestone in the country’s renewable energy transition. The project features 31 Vestas V174 turbines, each rated at 9.5 MW, delivering a total installed capacity of ~295 MW. Once fully operational, TPC II ZN26 will generate approximately 1 TWh of clean energy annually, enough to power 270,000 households and reduce over 400,000 tons of CO₂ emissions per year.
  • B
    Brotas de Macaúbas Wind Farm - Brazil
    Aug 2021 - Sep 2022 (1 year 2 months)
    57 X Alstom ECO86
  • C
    Carrefour Power Plant - Haiti
    Mar 2021 - Jul 2021 (5 months)
    2 X GE TM2500
  • G
    General Rojo Power Plant - Argentina
    Nov 2019 - Sep 2020 (11 months)
    GE Combined Cycle 4x50MW + 1x60MW
  • R
    Renova Wind Project III - Brazil
    Dec 2013 - Current (12 years 9 months)
    225 GE 1.6 x 82.5m + 05 GE 1.6 x 100m
  • U
    União dos Ventos Wind Farm (Serveng)
    May 2013 - Sep 2013 (5 months)
    108 x Wind GE 1.6MW - Brazil
  • A
    Asa Branca Wind Farm
    Jan 2013 - May 2013 (5 months)
    ContourGlobal's 160 MW Asa Branca wind farm, located in the state of Rio Grande do Norte on the northeast coast. 100 x 1.6 GE's MW_Wind Turbines.
  • Q
    Q-CELLS - Solar Project - USA
    Dec 2012 - Jan 2013 (2 months)
    5 MW GE Solar Inverter Cabinets and Sun I/Q Scada Cabinet. Celina, OH, USA.
  • W
    Wildcat Wind Farm_Indiana USA
    Nov 2012 - Current (13 years 10 months)
    200 MW_GE Wind Turbines
  • N
    North Sky River Wind Farm - California USA
    Oct 2012 - Current (13 years 11 months)
    339 MW - GE Wind Turbines
  • R
    Renova Wind Farm
    Feb 2012 - Jul 2012 (6 months)
    184 X1,6 MW GE Wind Turbines
  • B
    Bioenergy Wind Farm
    Nov 2011 - Feb 2012 (4 months)
    18 X 1.6 GE's MW_Wind Turbines
  • P
    Pedra do Sal Wind Farm
    Nov 2008 - Jan 2009 (3 months)
    20 X 0,9 MW Enercon's Wind Turbines_Piauí_Brazil.
  • B
    Beberibe Wind Farm
    Jan 2008 - Jul 2008 (7 months)
    32 X 0,8 Enercon's MW_Wind Turbine_Ceará_Brazil
  • V
    Vale dos Ventos Wind Farm
    Dec 2007 - Jul 2008 (8 months)
    60 X 0.8 Enercon's MW_Wind Turbines_Paraíba_Brazil
  • M
    Millennium Wind Farm
    Jan 2007 - Jul 2007 (7 months)
    13 X 0.8 MW Enercon's Wind Turbines_Paraíba_Brazil
  • R
    Rio do Fogo Wind Farm
    Feb 2006 - Dec 2006 (11 months)
    62 X 0.8 Enercon's MW Wind Turbines_RN_Brazil.
  • C
    Complexo Asa Branca
    100 X GE 1.6MW
  • D
    Desa - Morro dos Ventos
    91 x GE ESS 1.6MW Wind Turbine.
  • B
    Bioenergy
    18 X GE 1.6 MW_Wind Turbines
  • N
    NEXTERA - North Sky River Wind Farm - Califórnia City - CA - USA
    100 X1,6 MW GE Wind Turbines
  • S
    SKY RIVER
    100 X GE ESS 1.6MW-100
  • R
    RENOVA - Wind Farm - Guanambi - BA - BRA
    184 X1,6 MW GE Wind Turbines
  • 0
    08) Projeto Alto Sertão I e II - Renova Energia (Caetité/BA/Brasil)
    Em julho de 2012 a Companhia inaugura o maior complexo eólico da América Latina, instalado no Sudoeste da Bahia, nos municípios Caetité, Guanambi e Igaporã. Os 14 parques eólicos comportam 184 aerogeradores e 293,6MW de capacidade instalada, contratada no leilão de energia reserva (LER) de 2009.
  • S
    Serveng
    160 MW Wind Power Plant - GE 1.6 Serveng - Ventos Potiguares - São Miguel do Gostoso - RN - Brasil
  • 0
    09) Projeto Bioenergy - (Guamaré/RN/Brasil)
    Comissioning 18x GE 1.6 MW_Wind Turbines. Running first GE WTG in Latin America.