A

Abel Contreras Ramírez

About

Detail

Toluca de Lerdo, Estado de México, Mexico

Contact Abel regarding: 
work
Full-time jobs

Timeline


work
Job
school
Education
flag
Award

Résumé


Jobs verified_user 50% verified
  • M
    Master Materials Scheduler verified_user Verified experience
    Oct 2023 - Nov 2023 (2 months)
    • Review customer schedules and develop, communicate and monitor a production schedule by part number and by work center for the plant by program. • Material requirements lists and production plans for product manufacturing, forecasting material requirements from customer demand and routing labor details within the plant ERP system. • Check production activity to provide a controlled flow of scheduled materials to meet production requirements. • Follow up with management to arrange schedule changes due to delays, design changes and material or labor shortages. • Evaluate production specifications and plant capacity data to determine manufacturing processes, tooling and material requirements. • Timely follow-up with customers for chang
  • L
    Production Supply Planner verified_user Verified experience
    Logistics Planning
    Jun 2020 - Oct 2023 (3 years 5 months)
    Aderogyl Duties: • Creation of production plan • Follow up and ensure the execution of the production plan. • Demand variation review • Input management • Inventory management • Just-in-time management • Control stock levels. • Detailed calendars for the production plan. • Balance of production lines. • Assign workers and other personnel to specific production operations. • Schedule shifts according to production needs. • Monitor adherence to the production schedule. • Address problems as they arise, with the goal of minimizing downtime (CAPA and shutdown events). • Obtain production schedule information (number of parts, defect rate, value added, etc.). • Prepare and send performance and status reports. • Keep production sc
  • L
    Junior Trainee
    Lean Continuous
    Jun 2019 - Jun 2020 (1 year 1 month)
    • Update and follow up of OEE of primary packaging lines, • Develop and implement the Sanofi manufacturing system based in lean principles, Sanofi Standards, and best practices of the division, in the overall site as answer to the productivity, OEE, Plant cycle time and Cost. • Perform the priorities site 2020 workshop. • Lead people engagement (1 day as operator 2019) (Go Gemba upper management involvement).
  • Souk
    Planner
    Souk
    Jan 2018 - Apr 2019 (1 year 4 months)
    A scheduler in a national survey company organizes logistics, allocates resources, and supervises the progress of survey teams. They manage routes, deadlines, and necessary tools, ensuring goals are met. Additionally, they monitor progress and solve logistical issues to ensure surveys are conducted efficiently.
Education verified_user 0% verified
  • U
    Industrial Engineering
    UNIVERSIDAD POLITECNICA DEL VALLE DE TOLUCA
    Jan 2016 - Jan 2020 (4 years 1 month)
Awards verified_user 0% verified
  • SANOFI AVENTIS
    Continuous improvement
    SANOFI AVENTIS
    Dec 2020