Harvey Redfield

Harvey Redfield

About

Detail

PLM Analyst
San Mateo, California, United States

Contact Harvey regarding: 
work
Full-time jobs

Timeline


work
Job

Résumé


Jobs verified_user 0% verified
  • Skydio
    PLM Analyst
    Skydio
    Sep 2025 - Current (1 year 1 month)
  • 3D ROBOTICS
    E-Commerce & ERP System Manager
    3D ROBOTICS
    May 2025 - Current (1 year 5 months)
    • Maintain and develop the company’s online shop (BigCommerce), including product setup, scripting, and template customization.
    • Oversee ERP system (Odoo) implementation and management, including data migration, module building, form and template customization (e.g., lot labels, work orders).
    • Train and support users across departments, ensuring operational alignment with ERP functionality.
    • Configure and manage workflows for manufacturing and logistics processes, improving internal coordination.
    • Support manufacturing operations and project timelines through ERP-integrated work order processing.
  • Radar
    Enterprise Resources Planning Implementation Consultant
    Radar
    Jan 2024 - Dec 2024 (1 year)
    • Led the configuration and setup of NetSuite ERP to align with business requirements and improve system efficiency.
    • Migrated financial and operational data from QuickBooks and Arena PLM, ensuring seamless integration and accuracy.
    • Managed the import of BoMs within NetSuite to maintain data integrity and support manufacturing processes.
    • Provided end-user training and documentation to enhance adoption and optimize system utilization.
    • Collaborated with cross-functional teams to refine workflows, automate processes, and troubleshoot system challenges.
  • Fellow
    PLM Analyst and System Manager; Documentation Control
    Fellow
    Oct 2022 - Nov 2023 (1 year 2 months)
    • Led the implementation and configuration of Arena PLM, including user onboarding, data migration, and configuration.
    • Created and managed complex multi-level BoMs, including product variations for region, color, and size.
    • Managed Engineering Change Orders (ECOs) and change control processes, working closely with engineering and manufacturing teams.
    • Checked and validated BoMs for accuracy prior to release to production.
    • Created and maintained manufacturing BoMs (mBoMs) derived from engineering BoMs (eBoMs).
    • Maintained drawings, CAD files, and datasheets to support manufacturing and sourcing.
    • Maintained the Master Part List (MPL) and Approved Manufacturer List (AML) to ensure sourcing accuracy, regul
  • Cana Technology, Inc.
    Engineering Program Specialist; PLM System Manager
    Cana Technology, Inc.
    Aug 2021 - May 2022 (10 months)
    • Led the implementation and configuration of Duro PLM, including user onboarding, data migration, and configuration.
    • Managed complex multi-level Bills of Materials (BoMs), ensuring structure accuracy, variant coverage, and alignment with engineering, manufacturing, and sourcing requirements.
    • Managed Engineering Change Orders (ECOs) and change control processes, working closely with engineering and manufacturing teams.
    • Checked and validated BoMs for accuracy prior to release to production.
    • Created and maintained manufacturing BoMs (mBoMs) derived from engineering BoMs (eBoMs).
    • Developed and implemented a standardized internal part numbering system to streamline part creation and improve data consistency.
  • m
    ERP/PLM Systems Manager
    mRobotics.io
    Oct 2016 - May 2019 (2 years 8 months)
    • Led the implementation and configuration of PLM and ERP, including user onboarding, data migration, and configuration.
    • Managed complex multi-level Bills of Materials (BoMs), ensuring structure accuracy, variant coverage, and alignment with engineering, manufacturing, and sourcing requirements.
    • Managed Engineering Change Orders (ECOs) and change control processes, working closely with engineering and manufacturing teams.
    • Checked and validated BoMs for accuracy prior to release to production.
    • Oversaw MRP planning and supported MES-related workflows, including work order generation, production scheduling, material availability checks, and shop floor documentation.
    • Created and maintained manufacturing BoMs (
  • 3D ROBOTICS
    PLM System Manager; ERP Administrator
    3D ROBOTICS
    Oct 2011 - Mar 2016 (4 years 6 months)
    • Led the implementation and configuration of Arena PLM, including user onboarding, training, and configuration.
    • Managed complex multi-level Bills of Materials (BoMs), ensuring structure accuracy, variant coverage, and alignment with engineering, manufacturing, and sourcing requirements.
    • Managed Engineering Change Orders (ECOs) and change control processes, working closely with engineering and manufacturing teams.
    • Checked and validated BoMs for accuracy prior to release to production.
    • Created and maintained manufacturing BoMs (mBoMs) derived from engineering BoMs (eBoMs).
    • Maintained drawings, CAD files, and datasheets to support manufacturing and sourcing.
    • Maintained the Master Part List (MPL) and A
Education verified_user 0% verified
  • R
    High School Diploma
    Rancho Vista High School
This is a community-created genome.