Christopher Haas

Christopher Haas

About

Detail

Solution Architect at P3 Adaptive
Minneapolis, Minnesota, United States

Contact Christopher regarding: 
work
Full-time jobs

Timeline


work
Job
school
Education

Résumé


Jobs verified_user 0% verified
  • P3 Adaptive
    Solution Architect
    P3 Adaptive
    Jun 2020 - Current (6 years 5 months)
  • P
    Owner
    Precision DAX, LLC
    Jan 2019 - Current (7 years 10 months)
    I specialize in minimalist reports created in Power BI, allowing customers to focus on the decisions they need to make...not on interpreting the data. www.precisiondax.com
  • Johnson Controls
    Senior Power BI Developer
    Johnson Controls
    Dec 2016 - May 2020 (3 years 6 months)
    Develop data models and front end visualizations for Power BI dashboards/reports shared internally within the enterprise and externally to customers. Co-manage the Power BI Premium environment for 8 developers. Tune and optimize existing models for performance. Develop and share best practices (back-end modeling and front-end visualizations) within the group
  • Fiverr
    Freelance Consultant - PrecisionExcel
    Fiverr
    Jun 2015 - Jun 2020 (5 years 1 month)
    https://www.fiverr.com/precisionexcel - I transform people's data into INFORMATION! - Projects include dashboards, data visualization, file automation, and custom reporting - Now a Level 2 Seller, Delivered 55+ projects to 30 clients across 9 countries - Delivered all projects on time while maintaining very high customer rating
  • S
    Supply Chain Strategist
    Apr 2014 - Dec 2016 (2 years 9 months)
    - Lead Developer for global dashboard project using Qlik, creating data model from 4 instances of SAP - Managed $42M spend across 17 NA facilities, realized $1.38M in savings through preferred suppliers - Designed a spend dashboard to identify top savings opportunities at each plant - Negotiated national propane contract, implementing across all sites to save $250k/yr - Collaborated on the development of purchasing procedures to become SOX-compliant - Automated monthly reports for 2 departments, saved 16 hours / month Show less
  • Dart Container
    Senior Quality Engineer
    Dart Container
    Oct 2012 - Mar 2014 (1 year 6 months)
    - Redesigned Seeper Testing method to decrease Type II errors, increasing customer service levels - Proposed new Acceptance Sampling Program to provide better service to top customers - Integrated newly acquired Solo’s QA processes with Dart’s, identifying best practices from each - Initiated Six Sigma pilot projects in plants to minimize top losses - Developed and lead training on statistical variation, causal analysis techniques
  • Unilever
    Project Engineer
    Unilever
    Aug 2011 - Sep 2012 (1 year 2 months)
    - Oversee $120MM project to relocate 10 novelty ice cream production lines, ensure 3A compliance - Maintain project schedule and new instrument list (900+ assets, $1MM) to optimize capital spending - Redesigned piping layout for Breyer’s process, reduced product give-away by 66% - Redesigned Peanut Butter Pump skids, cause of $75M in quality related losses - Eliminated maintenance cost of $150M / yr, increased MTBF by 50% - Optimized CIP logic to reduce product inadvertently sent to drain, $20k / yr - Lead Quick Kaizen teams to identify and eliminate top material losses, realized $700k in 4 months Show less
  • Unilever
    Procurement Ops Analyst
    Unilever
    Jul 2010 - Jul 2011 (1 year 1 month)
    - Managed Value Improvement Projects with cross-functional teams (Marketing, R&D, Engineering) - Identified $150M / yr in savings on Good Humor novelty bars - Launched 28 new SKUs in Popsicle, Good Humor, and Ben & Jerry's in 2011, all "On Time In Full" - Coordinated ordering and delivery of all raw and pack materials to factories for line trials - Provided cost analysis for raw material and packaging to support business case -Oversaw specification development of new 60+ raw materials with R&D and suppliers Show less
  • Unilever
    Reliability Engineer
    Unilever
    Jun 2009 - Jul 2010 (1 year 2 months)
    - Managed $150M project to redesign Bead Dosing System, eliminating OT spend by $360M / yr - Created new process documentation and trained 4 crews of operators - Drove TPM methodology to minimize "Out of Soap" (Logistics loss) on pack floor Line 6 - Replicated learning's across all lines; Total savings realized = $1MM / yr; - Performed Design of Experiment to model moisture % loss in a drying process - Reduced cycle time by 17%, increased annual throughput by $862M - Created DOE template, trained 7 colleagues; 3 other DOEs have been completed since. - Standardized ASPEN plots across all areas of process - Created 24 training documents for use by operators and engineers Show less
  • Anheuser-Busch
    Process Optimization Co-Op
    Anheuser-Busch
    Jun 2007 - Aug 2009 (2 years 3 months)
    - Optimized rinse in Hot Wort Receiver, reducing water usage by 2,000 gal / batch (66% reduction) - Designed a new drain cup for valve manifolds, $80k /yr savings in material and waste - Designed cleaning plan of newly installed piping, lead process engineer on commissioning team - Produced and evaluated preliminary Bud Light Lime formulae, including scale-up in Pilot Brewery
Education verified_user 0% verified
  • Michigan State University
    bachelor, BS, Chemical Engineering, 3.34
    Michigan State University
    Jan 2004 - Jan 2009 (5 years 1 month)
This is a community-created genome.