Vishnu Kumar

Vishnu Kumar

About

Detail

Manager - supplier quality and PLM
Tamil Nadu, India

Contact Vishnu regarding: 
work
Full-time jobs

Timeline


work
Job

Résumé


Jobs verified_user 0% verified
  • Accenture
    Packaged app development senior analyst
    Accenture
    Jul 2025 - Current (1 year 4 months)
  • Schneider Electric
    Manager - supplier quality and PLM
    Schneider Electric
    Jul 2024 - Current (2 years 4 months)
    • Assist in developing and establishing the 'rules' to support the construction of item
    masters, bills of material and routings.
    • Prioritizes Review of ECOs and expedites release of ECO, in the implementation
    cycle.
    • Executing Engineering Change Management like processing & reviewing Change
    Orders
    • Review ECO's for content completeness, Structure of Bill of Material, customer
    impact (internal & external), organizational impact, and functional product impact.
    • Collaborate with various suppliers to developcomponentsforElectro-mechanical As-
    assemblies as per Schneider Requirement.
    • Validate Supplier parts (sheet metal fabricated parts, corrugation boxes,
    Pallets, labels, and Fast
  • Schneider Electric
    Manager - supplier quality and PLM
    Schneider Electric
    Jul 2024 - Current (2 years 4 months)
    • Assist in developing and establishing the 'rules' to support the construction of item masters, bills of material and routings.
    • Prioritizes Review of ECOs and expedites release of ECO, in the implementation cycle.
    • Executing Engineering Change Management like processing & reviewing Change Orders
    • Review ECO's for content completeness, Structure of Bill of Material, customer impact (internal & external), organizational impact, and functional product impact.
    • Collaborate with various suppliers to developcomponentsforElectro-mechanical As-assemblies as per Schneider Requirement.
    • Validate Supplier parts (sheet metal fabricated parts, corrugation boxes,Pallets, labels, and Fasteners) as per engineering requiremen
  • MillerKnoll
    Database modeler
    MillerKnoll
    Aug 2022 - Jul 2024 (2 years)
    1.Assist in developing and establishing the 'rules' to support the construction of item masters, bills of material and routings
    2. Coordinate the interface with New Product Development, the configuration software and Marketing on methods to develop system information for New Product Development programs
    3.Create and maintain dem flows for database processes within the manufacturing operational system
    4.Develop spreadsheets of unique data per product line for generic bill of material
    5.Establish the engineering/manufacturing system information (item masters and bills of material) to support the NPC process
    6.Interface between product engineering, manufacturing engineering and configuration software to develop a
  • Schneider Electric
    Design And Development Engineer
    Schneider Electric
    Oct 2020 - Aug 2022 (1 year 11 months)
    1.collaborate with various suppliers to develop components as per Schneider requirement.
    2. validate supplier parts (sheet metal fabricated parts, corrugation boxes, pallets, labels and fasteners)as per Schneider requirement.
    3. review supplier documents like inspection report, PFD PFMEA, Control plan,SPC, ROHS etc
    4. conduct packaging analysis as per Schneider standard and carryout road test whenever required. create report and suggest improvement actions
    5. validate prototype, engineering drawings, BOMs and assembly work instructions and stream line them before releasing in PDM for production
    6. consolidate Change requests during various stage of project, analyze impact through CFT Review, conduct physical validat
  • PENGUIN APPARELS PRIVATE LIMITED
    Industrial Engineer
    PENGUIN APPARELS PRIVATE LIMITED
    May 2019 - Sep 2019 (5 months)
    1. identify and deploy kaizen on the shop floor
    2. calculate SAM for every apparel change and balance line. update the same in Operation bulletin
    3. develop lean methods for efficient management at every station
    4. plan and manage production, remove bottlenecks and monitor defects
    5. use red tag approach plan training to reduce human errors and re-enforce principles and techniques
    6. create weekly productivity report and propose improvement actions.
Education verified_user 0% verified
  • V
    Bachelor of Engineering - BE, Mechanical Engineering
    Vickram College of Engineering, Madurai Sivagangai Road, Enathi
  • S
    schooling, Biomathematics
    Sourashtra higher secondary school
  • Bharathiar University
    Master of Arts - MA, Yoga for human excellence
    Bharathiar University
  • SVKM's Narsee Monjee Institute of Management Studies (NMIMS)
    Master of Business Administration - MBA, Operation and data science
    SVKM's Narsee Monjee Institute of Management Studies (NMIMS)
  • Bharathiar University
    Master of Arts - MA, Yoga for human excellence, first class
    Bharathiar University
  • S
    schooling, Biomathematics, first class
    Sourashtra higher secondary school
  • V
    Bachelor of Engineering - BE, Mechanical Engineering, first class
    Vickram College of Engineering, Madurai Sivagangai Road, Enathi
This is a community-created genome.